Download Print this page

Procedures Of Wiring; Wiring Of The Outdoor Unit - Hitachi RAS-X10CD Installation Manual

Split-unit
Hide thumbs Also See for RAS-X10CD:

Advertisement

Please mount the Outdoor unit on stable ground to prevent vibration
and increase of noise level.
Decide the location for piping after sorting out the different types of
pipe available.
Open the side plate by unscrewing the screws as shown below.
!
WARNING
THIS APPLIANCE MUST BE EARTHED.
Power supply shall be connected at the rated voltage, otherwise the unit will be
broken or could not reach the specifi ed capacity.

Procedures of Wiring

Detail of cutting the connecting cord
When removing the connecting wires for the Indoor unit, please remove the low cover panel in
front of the unit.
The naked part of the wire core should be 10 mm and fi x it to the terminal tightly. Then try to
pull the individual wire to check if the contact is tight. Improper insertion may burn the terminal.
Be sure to use only power cables approved from the authorities in your country. For example
2
in Germany: Cable type: NYM 3x1.5mm
, (fuse = 16A time delay)
Please refer to the installation manual for wire connection to the terminals of the units. The
cabling must meet the standards of electrical installation.
There is a AC voltage of 220-230V between the L and N terminals. Therefore, before servicing,
be sure to remove the plug from the AC outlet or switch off the main switch.
Do not make any connection in the middle of the connecting cable. It may cause the wire over
heated, emit smoke and fi re.
1
Insulation And Maintenance Of Pipe Connection
The connected terminals should be completely sealed with
heat insulator and then tied up with rubber strap.
Please tie the pipe and power line together with vinyl tape
as shown in the fi gure showing the installation of Indoor and
Outdoor units. Then fi x their position with holders.
To enchance the heat insulation and to prevent water
condensation, please cover the outdoor part of the drain hose
and pipe with insulation pipe.
Completely seal any gap with putty.
3
Power Source And Operation Test
Power Source
CAUTION
!
Please use a new socket. Accident may occur due to the
use of old socket because of poor contact.
Please plug in and then remove the plug for 2 – 3 times.
This is to ensure that the plug is completely plugged into
the socket.
Keep additional length for the power cord and do not
render the plug under external force as this may cause
poor contact.
Do not fi x the power cord with U-shape nail.
<
>
IA1114: B
INS RAS-X10CD-SD10CD (EN2) 1
INS RAS-X10CD-SD10CD (EN2) 1
Preparation of Pipe
1
Use a pipe cutter to cut the copper pipe.
Jagged edge will cause leakage.
Point the side to be trimmed downwards during trimming to prevent copper
chips from entering the pipe.
Before fl aring, please put on the fl are nut.
Outer
Thickness
Diameter (mm)
6.35 (1/4)
9.52 (3/8)
12.70 (1/2)
15.88 (5/8)
2
Pipe Connection
In case of removing fl are nut of an Indoor unit, fi rst remove a nut
!
CAUTION
of small diameter side, or a seal cap of big diameter side will fl y
out. Prevent water from entering into the piping when working.
!
WARNING
2
Installation Of Remote Controller
The remote controller can be placed in its holder which is
fi xed on wall or beam.
To operate the remote controller at its holder, please ensure
that the unit can receive signal transmitted from the controller
at the place where the holder is to be fi xed. The unit will beep
when signal is received from the remote controller. The signal
transmission is weaken by the fl uorescent light. Therefore,
during the installation of the remote control holder, please
switch on the light, even during day time, to determine the
mounting location of the holder.
The controller should
be insert from top into
bottom side of the
holder as shown in
fi gure beside.
Operation Test
Please ensure that the air conditioner is in normal operating
condition during the operation test.
Explain to your customer the proper operation procedures
as described in the user's manual.
!
CAUTION
Recommend to use
R410A fl aring tool.
A (mm)
Flare tool for R410A
Conventional fl are tool
(mm)
Clutch type
Wing nut type
Clutch type
~
0.0
0.5
1.0~1.5
1.5~2.0
0.8
~
0.0
0.5
1.0~1.5
1.5~2.0
0.8
~
0.8
0.0
0.5
1.5~2.5
1.0~1.5
~
1.5~2.5
1.0
0.0
0.5
1.0~1.5
Outer
Torque N·m
dia.of pipe
(kgf
·
cm)
Small dia. side
6.35 (1/4")
13.7 – 18.6 (140 – 190)
Large dia. side
9.52 (3/8")
34.3 – 44.1 (350 – 450)
12.7 (1/2")
44.1 – 53.9 (450 – 550)
Small dia. side
19.6 – 24.5 (200 ~ 250)
6.35 (1/4")
Valve
head cap
Large dia. side
19.6 – 24.5 (200 ~ 250)
9.52 (3/8")
29.4 – 34.3 (300 – 350)
12.7 (1/2")
Valve core cap
12.3 – 15.7 (125 ~ 160)
Wiring Of The Indoor Unit
For wire connection of the Indoor unit, you need to open or remove front panel
and electrical cover.
Method to remove front panel
Please refer to Instruction Manual – "Removing the Front Panel" under "Cleaning
of Front Panel".
Method to remove electrical cover
Remove the screw and electrical cover.
Insert the connecting cord (C, D) from the back of unit.
Fixed the wire to terminal wires fi rmly as shown in fi gure at right side.
Electrical cover
Screw
Connecting cord

Wiring of The Outdoor Unit

Please remove the side plate for wire connection.
If you cannot attach the side plate due to the connecting
cord, please press the connecting cord in direction to the
!
front panel to fi x it.
Be sure that the hooks of the side plate is fi xed in certainly.
WARNING
Otherwise water leakage may occur and this causes short
circuit or faults.
IMPORTANT
Cable length
Wire cross-section
up to 16m
1.5mm
2
IMPORTANT
up to 15m
2.5mm
2
Fuse Capacity
up to 25m
4.0mm
2
16A time delay fuse
Pump Down Method When Reuse
Existing Piping (R22 Model) for
R410A Model
Compressor oil of R22 model is insoluble in compressor
oil of R410A model. The mixing of compressor oil may
cause damage of compressor.
Possibility of Mixing
Reuse of piping of R22 model is dangerous because
of its compressor oil.
When reuse piping of R22 model, pump down must be
carried out properly to ensure compressor oil which is
remained inside piping is collected away.
!
CAUTION
Reuse of piping R-22 model only apply if previous
model is Hitachi and proper pump down method is used.
To Reuse Old Piping
Piping of R22 model can be reused only when air-
conditioner is properly pumped down.
The purpose of pump down is to collect back the
compressor oil (which is mixed with refrigerant and
circulating inside refrigeration cycle) properly into the
outdoor unit of air conditioner.
3
Removal Of Air From The Pipe And Gas Leakage Inspection
Procedures of using Vacuum Pump for Air Removal
When the meter reaches - 101KPa
(-76cmHg) during pumping, fully
As shown in right fi gure, remove the cap
tighten the shuttle.
of valve core. Then, connect the charge
1
hose. Remove the cap of valve head.
Connect the vacuum pump adapter to the
vacuum pump and connect the charge
hose to the adapter.
Valve
Fully tighten the "Hi" shuttle of the
manifold valve and completely unscrew
the "Lo" shuttle. Run the vacuum pump
2
for about 10–15 minutes, then completely
tighten the "Lo" shuttle and switch off the
When pumping starts, slightly loosen the
fl are nut to check of air sucked in. Then
vacuum pump.
tighten the fl are nut.
Completely unscrew the spindle of
3
the service valve (at 2 places) in anti-
clockwise direction to allow the fl ow of
coolant (using Hexagonal Wrench key).
Remove the charge hose and tighten
the cap of valve head. Check the cap's
4
periphery if there is any gas leakage.
The task is then completed.
Gas Leakage Inspection
Please use gas leakage detector to check if leakage
occurs at the connection of Flare nut as shown on
the right.
If gas leakage occurs, further tighten the connection
to stop leakage. (Use the detector provided for
R410A)
Connect the earth cord
After remove the screw
and band, put the
connecting cords and fi x
the band with screw.
Investigate the power supply capacity and other electrical conditions
at the installation location.
Depending on the model of room air conditioner to be installed,
request the customer to make arrangements for the necessary
electrical work etc.
The electrical work includes the wiring work up the outdoor. In
localities where electricity conditions are poor, use of a voltage
regulator/stabilizer is recommended.
Install outdoor for the room air conditioner within the reaching range
of the line cord.
CAUTION
Outdoor supply cords shall not be lighter
than polychloroprene sheathed fl exible cord
with code designation 60245 IEC 57.
Proper Pump Down Method
1
Operate air conditioner
2
at cooling mode for
10~15 minutes
Most Important Process
Purpose: To make the
oil & refrigerant mix
together. They are in
separated condition when
air conditioner is
stopped.
3
Take out air conditioner unit.
It is advisable to fl ush
the piping with R410A to
avoid any contamination
remain before new
installation.
Meter showing pressure
Closed
R410A
Lo
Hi
Manifold valve
Charge hose
Vacuum
Valve
pump
Vacuum
pump
adapter
After 10~15 minutes of
pre operation, close 2s
valve. After 3 minutes,
close 3s valve.
Mixed
refrigerant
& oil will be
collected into
outdoor unit.
4
Install New Refrigerant
air conditioner
2/27/14 9:34 AM
2/27/14 9:34 AM

Advertisement

loading