Pre-Run Inspection; Equipment Set-Up; Cleaning - Ninja NWCU1312N Operating Instructions Manual

1200 psi
Table of Contents

Advertisement

Operations

Pre-Run Inspection

1. Check all fittings and connectors for proper
assembly.
2. Check all hoses for leaks. Repair or replace any
damaged hoses.
3. Check power cord(s) for any damage. If damaged,
replace.

Equipment Set-up

1. Plug power cords from machine into properly
grounded wall outlet. Power cords must be on
separate circuits.
2. Connect fresh water supply hose to auto-fill fitting
on control panel. Do not use water over 130°F.
Turn on water to supply hose. The solution tank will
fill to float level.
3. Connect pump-out hose to pump-out fitting on
control panel. Place opposite end of pump-out
hose in an appropriate drain area.
4. Connect vacuum hose to machine. Slide the swivel
cuff over the outlet on the tank.
5. Connect the hose to your machine and wand. Pull
back the knurled collar on the quick disconnect
coupler and push onto the connection on the
chassis. To avoid leaks, check to be that a positive
connection was made.
6. Turn solution pump, vacuum, and pump-out
switches to the on position.
12

Cleaning

1. Prior to cleaning, make certain that the floor tool is
2. When cleaning, keep the floor tool flat on the
3. The float shutoff inside the recovery tank will
NOTE: When using a powder cleaner, pre-mix with
hot water in a clean container before adding to the
solution tank.
86327530 NINJA WARRIOR 1200 PSI
functioning properly.
surface being cleaned.
impede the vacuum flow when the vacuum tank is
full. If this occurs, disconnect power from machine,
drain recovery tank, and clean pump-out strainer.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Century 400 warrior

Table of Contents