Page 1
CARRON 7.3KW STOVE MODEL 1 JULY 2010 CARRON CAST IRON STOVE INSTALLATION AND OPERATING INSTRUCTIONS Carron stoves are imported and distributed in the UK by: JIG UK Ltd, Hurlingham Business Park, Fulbeck Heath, A qualified solid fuel engineer must carry out the installation of this stove.
Page 2
Flue gas mass flow 5.0 g/s 7.4 g/s EN13240:2001 Weight of Stove 89.4 Kg 55.0 Kg THE CARRON STOVE Minimum distance to combustible materials: Behind the stove: 400mm To the side of the stove: 500mm CO at 13% 02: 0.33% Flue gas temperature: 309ºC...
Page 3
Ensure that the floor has sufficient load bearing capacity. Fit a load bearing plate if necessary. Fuels suitable for use in your Carron Stove: - To ensure that your chimney meets the required specifications it must: - Wood – logs (no larger than 250mm) should be dried for at least a year prior to burning, for other fuels please contact the manufacturer.
Page 4
Warranty plastic dustbins or bin-bags. It is important that ash does not build up to the extent that Carron Stoves are supplied with a 3 year stove body and 1 year inner components it contacts the underside of the grate.
Need help?
Do you have a question about the CAST IRON STOVE and is the answer not in the manual?
Questions and answers