Step 2. Framing the Fireplace
Fireplace framing can be built before or after the fireplace is
set in place. Framing should be positioned to accommo-
date wall coverings and fireplace facing material. The dia-
gram below shows framing reference dimensions.
CAUTION: MEASURE FIREPLACE DIMENSIONS AND
VERIFY FRAMING METHODS AND WALL COVERING
DETAILS BEFORE FRAMING.
Framing should be constructed of 2 X 4 lumber or heavier.
WARNING:
To ensure proper clearances
the front framing header
must be installed on its
narrow edge and to the front
of the frame.
A. 42"
B. 38 1/2"
Figure 3.
Framing Dimensions
Step 3. Installing the Vent System
WARNING: REFER TO THE HRV200PLUS
!
INSTALLATION MANUAL FOR PROPER
VENTING CONFIGURATIONS FOR THE
6000PLUS GAS APPLIANCE.
C. 22"
Heat & Glo • 6000PLUS • 2063-900 Rev. E • 11/05
Step 4. Positioning, Leveling, and
Securing the Fireplace
To properly position, level, and secure the fireplace:
• Place the fireplace into position (see Figure 4).
• Level the fireplace from side to side and from front to
back.
• Shim the fireplace with non-combustible material, such
as sheet metal, as necessary.
• Secure the fireplace to the framing by nailing or screwing.
WARNING:
To ensure proper clearances
the front framing header
must be installed on its
narrow edge and to the
front of the frame.
Figure 4. Proper Positioning, Leveling,
and Securing of a Fireplace
Step 5. The Gas Control System
WARNING: THIS UNIT IS NOT FOR USE WITH
!
SOLID FUEL.
The gas control system used with this model is the Intellifire.
Intellifire System
The Intellifire system includes a 3V control valve, electronic
module, and intermittent pilot.
WARNING: CONTINUOUS 110-120 VAC SER-
!
VICE MUST BE WIRED TO THE FIREPLACE
JUNCTION BOX.