Summary of Contents for CARRON CARRON CAST IRON STOVE
Page 1
BHC401-406 – Dated 12th Jan 2011 CARRON CAST IRON STOVE INSTALLATION AND OPERATING INSTRUCTIONS Carron stoves are imported and distributed in the UK by: JIG UK Ltd, Hurlingham Business Park, Fulbeck Heath, A qualified solid fuel engineer must carry out the installation of this stove.
Page 2
12 Pa Flue gas mass flow 4.0 g/s EN13240:2001 Weight of Stove 70.5 Kg THE CARRON STOVE Minimum distance to combustible materials: Behind the stove: 400mm To the side of the stove: 400mm CO at 13% 02: 0.64% Flue gas temperature: 268ºC Efficiency:76.9%...
Page 3
Do not fill the stove to a level higher than the bricks. The maximum amount of fuel specified for this manual should not be exceeded, overloading can cause excess Fuels suitable for use in your Carron Stove: - smoke. Operation with the door open can also cause excess smoke. The appliance Wood –...
Page 4
Controlling the stove - Setting the primary air supply (the inlet below the glass door) Carron stoves do not contain asbestos. However, please take care not to disturb any air control – sliding the air control to the right will allow the maximum amount of air into existing asbestos when removing an old stove.