Priming Procedure Ii; Spa - Jacuzzi The Cirrus IG Owner's Manual

Jacuzzi whirlpool bath
Table of Contents

Advertisement

Priming Procedure II

Use this priming procedure if your installation is such that the base of the equipment pack is lower than the rim of
the spa (see illustration.)
1. Turn all switches to OFF. Turn OFF circuit breakers at
service panel.
2. Open shut-off valves in the suction and discharge sys-
tem plumbing.
3. Open the air vents in the plastic elbows.
4. Close the hose bibb located in the equalizer tube be-
tween suction lines.
5. Fill the spa with water (using a garden hose) up to its
normal operating level, which is at the water indicator
mark on the skimmer/filter frame. As the water level in
the spa rises, it will bleed air out of the vent valves. When
water flows from the air vents, close them and continue
filling the spa to water indicator mark.
6 .Turn ON the circuit breaker at the service panel.
7. Turn ON the pumps one at a time.
PRIMING PROCEDURE II
(BELOW WATER LEVEL)
SPA RIM
SHUT-OFF VALVES AND PIPING NOT PROVIDED BY JACUZZI WHIRLPOOL BATH
OPERATION
17
EQUIPMENT
PACK
BASE

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cirrus ig d500000

Table of Contents