Download Print this page

Monte Carlo Fan Company 5DI44 Owner's Manual And Installation Manual page 3

Fan

Advertisement

1
Before you begin installing the fan, Switch
power off at Service panel and lock service dis-
connecting means to prevent power from being
switched on accidentally. When the service dis-
connecting means cannot be locked, securely
fasten a prominent warning device, such as a
tag, to the service panel.
4
Downrod mount installation
yoke
Loosen the 2 set screws till you can not
feel them on inside of yoke.
Note: If install fan on vaulted ceiling,
make sure open end of mounting
bracket is installed facing the higher
point of the ceiling and make sure the
ceiling angle is not steeper
than 30º.
7
Place downrod into fan yoke.
© 2013 Monte Carlo Fan Company
2
Before installing this fan make sure the outlet box is
properly installed to the house structure. To reduce
the risk of fire, electric shock, or personal injury,
mount to outlet box or supporting system acceptable
for fan support. (Mounting must support at least 35
lbs.)
5
Canopy
Downrod
Cross
pin
Canopy
Keeper
pin
disk
Remove Keeper pin and cross pin
from downrod. Place canopy and
caonpy disk cover over downrod.
8
Align the hole in the Downrod with the hole in
the Yoke. Insert the Pin through the Yoke and
Downrod until the point appears on the other
side.
3
3
Use metal outlet box suitable for fan support
(must support 35 lbs). Before attaching fan to
outlet box, ensure the outlet box is securley
fastened by at least two points to a structural
ceiling member ( a loose box will cause the fan
to wabble). Use only the screws provided
with the outlet box.
6
Downrod
Tread leadwires and safety
cable through downrod.
9
Install the keeper to pin.
8/13/2013

Advertisement

loading

This manual is also suitable for:

5di44xxd series