IBM 8260 Installation Instructions Manual page 17

8260 nways multiprotocol switching hub
Hide thumbs Also See for 8260:
Table of Contents

Advertisement

Installation Instructions
Subnetwork X (ATM address 39.99.99.99.99.99.0.9.77.77)
Peer Group 1
Peer Group 2
WS 1
WS 2
UNI
4.3
4.1
5.1
3.2
2.1
3.1
PNNI
vpc3
IISP
vpc3
void
HUB a (HN=1)
HUB b (HN=2)
HUB c (HN=1)
IISP
vpc0
Subnetwork Y (ATM address 39.99.99.99.99.99.99.0.0.88.88)
Peer Group 3
WS 3
6.1
4.3
HUB d (HN=1)
Figure 3. Example of a network in level PNNI phase 1 (v.3.1.0)
Page 17
PN : 26L0227
EC : F34705
June 17 1998
Copyright IBM Corp. 1998

Advertisement

Table of Contents
loading

This manual is also suitable for:

Atm control point 3.1.9

Table of Contents