Installation; Pre Installation; Unpacking - IFB EXECUTIVE PLUS WTEX+B Operating Manual

Table of Contents

Advertisement

CUSTOMER COPY
MODEL :
EXECUTIVE PIUS
DEALER'S NAME :
CUSTOMER'S NAME :
ADDRESS :
PIN CODE :
TEL. NO. (Resi.)
E-MAIL :
MOTOR SR. NO. :
DATE OF PURCHASE
:
SR. NO.
WTEX+B
(Off.)
34

INSTALLATION

Pre Installation

1. It is mandatory to have a 16 amp. 3-pin 230V AC, 50Hz
electrical point
with a 16 amp. MCB or Automatic short
circuit protection device within 1 meter of the machine.
Make sure it has proper earthing.
2. Fixed plumbing is recommended
for the machine.
The
water inlet
of the machine has a collar
with3/4"parallel internal threads.
The water supply point with an
exter nal
3/4"
parallel
should be available within1 meter
of the machine's location.
3. Two options on the water inlet and
drain pipe connection are shown.
In case these possibilities do not
exist for the drain pipe, please
arrange an additional length of
pipe.
4. Please inform our service centre for installation and demonstration
of the machine once the points mentioned above have been
completed.

Unpacking

1. Remove Carton.
2. Remove top packing cover.
3. Remove side packing and plastic jacket.
4. Remove packing from the bottom of the
motor
5. Place the machine at the site at which it is to be
Installed, and put the rat mesh.
WATER
SUPPLY
REDUCER
STOP
LOCK
1/2
3/4
thread
WATER INLET
DRAIN
PIPE
WATER INLET
DRAIN
PIPE
7
MACHINE
WATER
INLET

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents