Carrier 58MCA Installation, Start-Up, And Operating Instructions Manual page 36

111 series sizes 040—120 multipoise gas-fired condensing furnace
Table of Contents

Advertisement

CHECKLIST—INSTALLATION
Load Calculation
____________
Heating Load (Btuh)
____________
Cooling Load (Btuh)
____________
Furnace Model Selection
COMBUSTION AND VENT PIPING
Termination Location
________
Roof or Sidewall
________
Termination Kit — 2 Pipe or Concentric
________
Combustion-Air Pipe Length
________
Combustion-Air Pipe Elbow Quantity
________
Vent Pipe Length
________
Vent Pipe Length Quantity
Pipe Diameter Determined from Sizing
________
Table
________
Pipe Sloped To Furnace
Pipe Insulation
________
Over Ceilings
________
Low-Ambient Exposed Pipes
Copyright 1994 CARRIER Corp. • 7310 W. Morris St. • Indianapolis, IN 46231
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
PC 101
Catalog No. 565-906
Tab 6a 8a
________
________
________
________
________
________
________
________
________
________
________
Printed in U.S.A.
Form 58MXA-2SI
Condensate Drain
Unit Level or Pitched Forward
Internal Tubing Connections Free of
Kinks and Traps
External Drain Connection Leak Tight
and Sloped
Condensate Trap Primed before
Start-Up
Heat Tape Installed if Required
CHECKLIST—START-UP
Gas Input Rate (Set Within 2 percent
of Rating Plate)
Temperature Rise Adjusted
Thermostat Anticipator
Anticipator Setting Adjusted or
Cycle Rate (3 Cycles per Hr) Selected
Safety Controls Check Operation
Primary Limit
Pressure Switch
Pg 36
6-94
35031c
Replaces: 58MXA-1SI

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

58mxa

Table of Contents