115-V Wiring - Payne PG9MAB Series A Installation Manual

4-way multipoise fixed-capacity dual-vent condensing gas furnace sizes 040 thru 140 series a
Hide thumbs Also See for PG9MAB Series A:
Table of Contents

Advertisement

21-IN. WIDE
1
17
-IN. WIDE
CASINGS ONLY:
2
CASINGS ONLY:
SUPPORT RODS (3)
INSTALL FIELD-SUPPLIED
EXTEND 1/4" ON EACH
FILTER FILLER STRIP
SIDE OF FILTER AND
UNDER FILTER.
REST ON CASING FLANGE
3 "
"
1
24
/
2
1 "
FILTER
SUPPORT
Fig. 27—Bottom Filter Arrangement
A. 115-v Wiring
Before proceeding with electrical connections, make certain that voltage, frequency, and phase correspond to that specified on unit rating plate.
Check to be sure that service provided by power supply is sufficient to handle load imposed by this equipment. Refer to rating plate or Table 6
for equipment electrical specifications.
WASHABLE
FILTER
FILTER
RETAINER
GAS
SUPPLY
MANUAL
SHUTOFF
VALVE
(REQUIRED)
SEDIMENT
TRAP
UNION
Fig. 30—Typical Gas Pipe Arrangement
Fig. 28—Filter Installed for Side Inlet
A00290
Fig. 29—Removing Bottom Closure Panel
—29—
FRONT FILLER
PANEL
A00217
BOTTOM
CLOSURE
PANEL
A93047
A93324

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents