5.6 installation chEcklist

(1) High voltages exist when the PV-Panel is exposed to the sun. Expo-
sed terminals of the PV-Panel are alive, and can cause electric shock.
Avoid making physical contact with live parts of the device.
(2) After the PV-Panels are connected to the PV-Inverter, the output
voltage is higher than 100 VDC and the AC grid is not connected
to the inverter, the LCD displays "Model= XXXXXX"-> "Waiting"->
"No Utility". The RED "fault LED" turns on.
Initial Display before Connecting to the Public Utility
Function Button
(3) Check the connection between your PV-Inverter and AC Connection
System. And then check the connection between the Public grid and
AC Connection unit. Close the AC breaker or fuse in the unit.
(4) Under normal operation, the LCD displays: