Pre-Installing Pipes - Bosch ZBR16-3A Installation And Service Instructions Manual

Gas condensing boiler
Table of Contents

Advertisement

5.5

Pre-installing pipes

B Secure the installation template (supplied with the
technical documentation) to the wall; observe the
minimum side clearances of 4 inches (102 mm)
(
page 11).
B Drill holes for the appliance and for the hydraulics
connection plate in accordance with the mounting
template.
250
250
200
200
60 /1 00
60 /1 00
150
150
111
111
100
100
87
87
Fig. 12 Mounting template
NOTICE: For walls with insufficient load
capacity, the appliance and the hydraulics
connection plate must be mounted on a sheet
of plywood or similar reinforcement.
B Remove the mounting template.
Copyright (optional information)
80 /1 25
80 /1 25
3° 3°
3° 3°
B Secure the hydraulics connection plate and the
mounting bracket with the mounting kits supplied.
Fig. 13 Mounting of the hydraulics connection plate and the
mounting bracket
Installation | 39
6 720 641 933-30.1O
6 720 643 068 (2011/06)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents