Gravely Pro-Ride 254 Owner's/Operator's Manual page 14

Hide thumbs Also See for Pro-Ride 254:
Table of Contents

Advertisement

1
3
7
Figure 7
10
2
2. Install two ROPS lock pins (item 1) and
two 5/16 x 3/4 in. round knobs (item 2).
See Figure 7.
3. Torque lower mounting hardware
installed in steps 2 and of Install Base
Weldments on page 12 to 80 lbf-ft (109
N•m).
4. Tighten upper mounting hardware
installed in step 2 until they just contact
the hinge plate. To ensure that rollover
bar can lower and raise correctly, do not
overtighten.
Tighten round knobs to prevent center tube
from rattling during operation.
Fill Fuel Tank
Fill fuel tank. DO NOT OVERFILL! See
FILLING FUEL TANK on page 19.
GB - 14

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

992220Pro-ride 260992221Pro-ride 266992222

Table of Contents