Setup; Unfolding The Handle; Installing The Discharge Chute - Toro Power Clear 621 QZR Operator's Manual

Hide thumbs Also See for Power Clear 621 QZR:
Table of Contents

Advertisement

Setup

Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
1

Unfolding the Handle

No Parts Required
Procedure
1. Loosen the handle knobs, pull out the "U"-shaped
handle locks until you can move the handle freely, and
rotate the handle to the operating position (Figure 4).
1. "U"-shaped handle lock (2) 2. Handle knobs
2. Insert the end of the "U"-shaped handle lock into the
open hole in the handle and tighten the handle knobs
until they are snug (Figure 5).
Description
No parts required
Screws
Chute assembly
Figure 4
Qty.
Unfold the handle.
3
Install the discharge chute.
1
Important: Ensure that you do not pinch or kink
the control cable or the Quick Shoot™ cables
(Figure 6).
1. Control cable
5
Use
Figure 5
Figure 6
2. Quick Shoot™ cables

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power clear 621 qze3845838459

Table of Contents