After the system has been properly installed and
connected to both electrical and water supplies, it may
then be started.
Start-up and Checkout Procedures
Mounting
Check mounting to see that unit is level and securely
supported before filling with water.
Piping
Verify that all piping connections have been completed
as recommended and that water pressure is available.
Electrical
Verify that all wiring connections have been made in
accordance with all governing codes and the enclosed
VAPORSTREAM
®
VLC wiring diagram.
Caution: Only qualified electrical person-
nel should perform start-up procedure.
Control System
For start-up instructions, see the operations and
maintenance manual for your humidifier control system.
For operating instructions, see the VAPOR-LOGIC
Installation Instructions and Maintenance Operations
Manual.
18

START-UP PROCEDURE

Caution: Overtightening cover will cause leaks.
All cover knobs are turned down at the factory until
the bottom of the knob makes contact with the
flange, then one half turn further. If more compres-
sion is required, turn all knobs a half turn more. Do
not turn knobs more than a half turn before identify-
ing that a leak still exists.