After the system has been properly installed and con-
nected to both electrical and water supplies, it may then
be started.
Start-up and Checkout Procedures
Mounting
Check mounting to see that unit is level and securely
supported before filling with water.
Piping
Verify that all piping connections have been completed as
recommended and that water pressure is available.
Electrical
Verify that all wiring connections have been made in
accordance with all governing codes and the enclosed
®
VAPORSTREAM
VLC wiring diagram.
Caution: Only qualified electrical personnel
should perform start-up procedure.
Control System
For start-up instructions, see the operations and mainte-
nance manual for your humidifier control system.
For operating instructions, see the VAPOR-LOGIC
Installation Instructions and Maintenance Operations
Manual.

START-UP PROCEDURE

Caution:
All cover knobs are turned down at the factory until the
bottom of the knob makes contact with the flange, then
one half turn further. If more compression is required,
turn all knobs a half turn more. Do not turn knobs more
than a half turn before identifying that a leak still exists.

OPERATION

®
Overtightening cover will cause leaks.