Framing The Heater - Heat & Glo ST-HVBI-AU Installation And Operation Instructions Manual

Fireplaces
Table of Contents

Advertisement

1.2 Framing the Heater

Framing can be built before or after the heater is set in
place. Framing should be positioned to accommodate wall
coverings and heater facing material. The diagram below
shows framing reference dimensions.
CAUTION: MEASURE HEATER DIMENSIONS AND
VERIFY FRAMING METHODS AND WALL COVERING
DETAILS, BEFORE FRAMING CONSTRUCTION BEGINS.
Shows center of 254mm x 305mm (10 in. x 12 in.) flue
framing holes for top and rear flueing. The center of
the hole is 25.4mm (one inch) above the center of the
horizontal flue pipe. Framing should be constructed of
51mm x 102mm (2 in. x 4 in.) lumber or heavier.
A
1.21 M (47-5/8 in.) 1.08 M (42-1/2 in.) 584 mm (23 in.)
Figure 3.
Framing Dimensions
6
D
B
Heat & Glo • ST-HVBI-AU • 2082-900 Rev. C • 8/06
WARNING: FRAMING DIMENSIONS ASSUME
!
USE OF 1/2 INCH (12.7MM) (THICK WALL
COVERING MATERIALS ON EXTERIOR OF FRAM-
ING ONLY AND NO SHEETROCK ON INTERIOR OF
FRAMING.
A
C
D
909 mm (35-3/4 in.)
B
C
E
E
1.37 M (54 in.)

Advertisement

Table of Contents
loading

Table of Contents