Oki PACEMARK 4410 Service Manual page 86

Printer
Hide thumbs Also See for PACEMARK 4410:
Table of Contents

Advertisement

Match the direction of projections
Match the position of marks
1. Matching the phase of pin tractors
a. Match the direction of pin wheel projections on right/left pin tractor to that of mark on the 2 (rear
tractor drive gear)
b. Match the direction of wheel projections on right/left pin tractor to that of mark on 4 (drive gearB), and
install 2(drive gear B) to 5 3 (rear drive shaft of the rear tractor Assy) at a position where the
directions of marks on 4 (drive gear B) and 2 (rear tractor drive gear) match.
Open up the notch to 1mm and assemble it,
positioning the notch as shown in figure.
Wheel
Rear tracor Assy Gears phase drawing
4
45°
Notch is rotated by 45°
Rotated notch
8 Assembling friction piece
Pinwheel
85

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents