Installation Of Terminal Facilities - Gree HLR45SNa-M Installation And Operation Manual

Household (townhouse) central air conditioning unit
Hide thumbs Also See for HLR45SNa-M:
Table of Contents

Advertisement

8.1.2 Installation space requirement for outdoor unit
Whole installation:
Connect water fitting
from this side
>1200mm
8.1.3 Move and disassembly
1) It is better to use forklift or crane when moving the unit.
2) When suspending, please adopt canvas gallus, round the gallus at base of the unit and bundle it tightly,
meanwhile, ensure that the gallus would not tough heat exchanger.
3) When moving the unit, the slant angle should be smaller than 30°.
8.1.4 Installation mode
1) Fix the unit on separated concrete base with expand bolts directly.
2) It is also available to adopt angle iron or steel supporter that make off channel steel, add shake-
absorbing gaskets, and then place the unit on floor or roof. Ensure to keep the unit horizontally.

8.2 Installation of terminal facilities

Installation of indoor terminal fan coil should obey the installation regulation for air conditioning
facilities.
1) Suspend the fan coil according to the elevation shown on air conditioning project construction chart,
and please be aware to keep it horizontally.
2) Connect water in/out and water in/out joint of fan coil by soft joint; connect condensate water out pipe
on water tray and condensate water drainage hose by plastic host.
3) Electric wiring of fan coil, 3-speed switch and temperature control are as following:
Household (Townhouse) Central Air Conditioning Unit
Set electric power
cabinet at this side
>1000mm
12
Air
outiet