Download Print this page

Arrow Storage Products Commander series Owner's Manual & Assembly Manual page 24

Hide thumbs Also See for Commander series:

Advertisement

Step 8: Wall Panels
IMPORTANT:
At this time, take a moment to ensure the building is level and square. Measure
diagonally across the building from opposite corners; when these measurements
match, the building is square. For the remainder of assembly it will be important
that the building is both level and square.
Whenever a crimped rib and an uncrimped rib
meet, the crimped rib should be placed UNDER
the uncrimped rib if possible. See next page.
Crimped Rib
Use the diagram to the right when attaching Wall Panels.
• Secure the top row to Top Frames
• Secure the middle row to Wall Channels
• Secure the lower row to Floor Frames
• Secure the circled holes to the Panel next to it
IMPORTANT:
Panels over a Truss, you will need to 'roll'
the Panels as shown to be able to attach the
next Panel at the overlap. When securing the
Panel to the building with Small Screws, do
not insert Screws in the row of holes closest
to the last rib of the Panel. Next, roll the Panel
back slightly and attach the next Panel at the
overlap with a Small Bolt and Nut in the center
hole. Once this is done, continue securing the
Panel to the building.
Uncrimped Rib
When installing the Wall
FASTEN TO WALL CHANNELS
LEAVE LAST ROW OF HOLES EMPTY
24
EQUAL MEASUREMENTS
FASTEN TO TOP FRAMES
7822
FASTEN TO FLOOR FRAMES
UNTIL NEXT PANEL IS IN PLACE
24H

Advertisement

loading

This manual is also suitable for:

Mountaineer series