Summary of Contents for Arrow Storage Products CAM108
Page 1
719420814 01AA Owner’s Manual & Assembly Guide www.arrowsheds.com Gloves must be worn at all times to reduce Model No. CAM108 risk of injury! 10’ x 8’ Nominal Size Customer Service: 1-800-851-1085 Base 121” x 97” assist@arrowsheds.com Size 307,3 cm x 246,4 cm...
Page 2
SAFETY PRECAUTIONS... Safety precautions MUST be followed at all times throughout the construction of your building! Practice caution with the tools being used in the Care must be taken when handling various pieces assembly of this building. Be especially familiar with of your building since many contain sharp edges.
ASSEMBLY TIPS & TOOLS Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Use Teamwork: Two or more people are required to assemble your building.
FREQUENTLY ASKED QUESTIONS How long will it take to assemble the building? Assembly time depends on a variety of factors, including roof design, tools available, DIY skill and the pace at which you work. Guidelines for each shed assembly are approximate AFTER completion of the base, and assume two or more people working on the assembly.
Page 5
What kind of base do I use? You can: •Use an Arrow Base Kit •Pour a concrete slab •Build a wood deck/fl oor (use exterior-grade plywood) •Use patio blocks •Build on crushed gravel, dirt or grass Arrow provides a base kit accessory that is an option for most building sizes. If you are building a wood deck/fl oor, an Arrow fl...
What if the rear wall angle and channels are too large to fi t inside of the rear wall panels? Check the dimensions of wall assemblies. They should be slightly smaller than the fl oor frames. Lay the assemblies on top of the rear fl oor frame and pull them up to the top of the wall panels causing the corner panels to stand erect and not lean inward.
Page 7
HARDWARE LIST... 07AA Hardware Views by Key No. Part Part Qty. Description List 65103 Hex Nut (#8-32) #2 Phillips 11/32 Hex. 65923 Small Bolt (#8-32 x 3/8) (10 mm) 65004 Small Screw (#8AB x 5/16) (8 mm) 66783 Flat Head Bolt (#8-32 X 1/2) (13 mm) 65958 Long Bolt (#8-32 x 7/8) (22 mm) #2 Phillips...
Page 8
PARTS LIST... 08AA Part Part Qty. Selected End Views by Key No. Description List 6635 Roof Beam Bracket 9009 Gable Brace 9204 Roof Beam Brace 5210 Wall Panel 6521 Wall Panel 7571 Roof Panel 7743 Roof Panel 8576 Right Gable 8577 Left Gable 10 10699 Front Wall Panel...
ASSEMBLY OVERVIEW 11AA Install Corner Panels, Side Angles, Build the Floor Frame Rear Angles, and Front Header Attach Gables and Roof Beams Install Wall Panels, Wall Channels, and Door Jambs Install Roof Panel, Ridge Cap, Side Install Doors Trim, and Corner Cap Shed is now complete.
Page 12
CONSTRUCTING A BASE... No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an effective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.).
Page 13
Step 1: Floor Frames 13AA You will need for this page: 10704 Washers are to be used on painted parts only. Washers are not necessary on unpainted Side Floor parts and there are not enough to use on (QTY: 8) Frame every screw and bolt.
Page 14
Step 1: Continued 14AA You will need for this page: 10703 Front/Rear (QTY: 8) Floor Frame Overlap two (2) Front/Rear Floor Frames as 10703 shown and secure with four (4) Bolts and Nuts. Two (2) Bolts and Nuts must enter from bottom. BUILD TWO (2) FRAMES Bolts thru Top.
Page 15
Step 2: Wall Frames 15AA You will need for this page: 5986 9917 Rear Channel Rear Angle (QTY: 2) 5986 9917 Overlap two (2) Rear Wall Angles so that fi ve (5) holes align as shown. Insert one (1) Bolt and Nut through the center hole.
Page 16
Step 2: Continued 16AA You will need for this page: 10715 10706 10706 Side Channel Side Angle (QTY: 4) Overlap two (2) Side Wall Angles so that three (3) holes align as shown. Insert one (1) Bolt and Nut through the center hole.
Page 17
Step 3: 17AA Header You will need for this page: 10707 10708 Front Inner Front Outer (QTY:2) Header Header Connect the Front Inner Header to a Front Outer 10708 Header using one (1) Screw as shown. Repeat this for the opposite end. 10708 10707 10707...
Page 18
Step 4: Roof Beams 18AA You will need for this page: 10713 10713 BUILD TWO (2) BEAMS Roof Beam (QTY: 16) Overlap two (2) Roof Beams so that the bottom slots align as shown. Insert six (6) Bolts and Nuts as shown below. Overlap parts so the bottom slots align.
Page 19
Step 4: Continued 19AA You will need for this page: BUILD ONE (1) DOUBLE (MAIN) BEAM 10713 10713 Roof Beam (QTY: 14) 10713 Overlap two (2) Roof Beams so that bottom slots align but DO NOT INSERT BOLTS. Next, overlap two (2) more Roof Beams to form a second Roof Beam Assembly.
Page 20
Step 5: Door Pre-Assembly 20AA You will need for this page: 10856 10718 10719 10720 67236 Horizontal Door Handle Diagonal Door Adhesive Pad Door Panel (QTY: 2) Door Brace Brace Brace (QTY: 24) Start assembly by sliding the Door Handle Place the ends of Diagonal Door Braces Brace into the middle of the Door and securing it with small holes under Horizontal Door...
Page 21
Step 6: 21AA Right Door Assembly You will need for this page: 66609 66809 66054 Locking (QTY: 2) (QTY: 6) Hinge Handle Right Latch Attach Hinges to Door using six (6) Flat Head Bolts. Install Locking Handle using two (2) Long Bolts. Attach Latch to Locking Handle.
Page 22
Step 7: Left Door Assembly 22AA You will need for this page: 66609 66810 Left (QTY: 2) (QTY: 6) Hinge Handle Attach Hinges to Door using six (6) Flat Head Bolts. Install Locking Handle using two (2) Long Bolts. 66609 66810...
Page 23
Step 7: Continued 23AA You will need for this page: 66808 10721 66684 Bottom Top Latch Door Stop (QTY: 8) Latch Spring Spring Remove two (2) Screws from left side of Door Handle Brace and far left Screw from both top and bottom Horizontal Door Brace.
Page 24
Step 8: Floor Assembly 24AA You will need for this page: Assemblies from Step 1: • Front/Rear Floor Frame Assemblies (2) • Side Floor Frame Assemblies (2) (QTY: 8) Do NOT fasten your Floor Frames to your Base at this time. You will anchor your building after it is erected.
Page 25
Step 9: Corner Panels 25AA Be cautious when maneuvering You will need for this page: and placing Panels. Once Panels 10701 begin to go up it is important to be able to fi nish in a timely manner to reduce the possibility of wind Corner (QTY: 8) Panel...
Page 26
Step 10: Wall Framing 26AA You will need for this page: Assemblies from Step 2 and Step 3: • Rear Wall Angle Assembly (1) • Side Wall Angle Assemblies (2) • Header Assembly (1) (QTY: 8) • Use two (2) Screws to do each of the following: •...
Page 27
Step 11: Wall Panels FASTEN TO WALL ANGLES You will need for this page: 5210 6521 10699 [ NO HARDWARE NEEDED FOR THIS STEP ] FrontWall Wall Panel Wall Panel Panel Lay out all Panels in the positions shown below. FASTEN TO WALL CHANNELS (STEP 13) Double check that you have the correct Panel in each location.
Page 28
Step 11: Continued 28AA You will need for this page: Working one side at a time, lift the Panels into place and secure top and bottom of Panels with Screws. (QTY: 116) (QTY: 17) Place a Bolt and Nut through the center hole of the Panel everywhere Panels overlap, as shown below.
Page 29
Step 12: Door Jambs 29AA You will need for this page: 80057 10716 Right Door Left Door (QTY: 8) (QTY: 4) Jamb Jamb Secure Door Jambs with two (2) Screws in the top and bottom of each Door Jamb as shown. Secure Door Jamb to Panel using two (2) Bolts and Nuts as shown below.
Page 30
Step 13: Wall Channels 30AA You will need for this page: 10709 Assemblies from Step 2: • Rear Wall Channel Assembly (1) • Side Wall Channel Assemblies (2) Front Chan. (QTY: 2) (QTY: 56) Rear Wall Channel Assembly Install Rear Wall Channel Assembly by placing Screws through all remaining holes in Wall Panels.
Page 31
Step 14: Gables 31AA You will need for this page: 8577 8576 6635 69835 (QTY: 8) Left Gable Right Gable Bracket Edge Trim GABLES ARE STACKED TOGETHER DURING SHIPPING AND MAY BE MIS- TAKEN FOR ONE GABLE! SEPARATE GABLES BEFORE CONTINUING. Edge Trim (Plastic) Edge Trim MUST cover Gable edge.
Page 32
Step 14: Continued 32AA You will need for this page: 9009 (QTY: 14) (QTY: 3) Gable Brace Gable must fi t UNDER Side Wall Angle at corner. Working with one (1) Gable at a time, attach the Rear Gables to the Use bolts where Rear Wall Angle with fourteen (14) Angles overlap.
Page 33
Step 14: Continued 33AA You will need for this page: 9009 6228 (QTY: 18) (QTY: 2) Gable Brace Track Sup. Leave two (2) holes open on each side of the Gable peak to attach Track Support. Working with one Gable at a time, attach the front Gables to the Header with Screws.
Page 34
Step 15: Roof Framing 34AA You will need for this page: 67545 Assemblies from Step 4: • Double (Main) Roof Beam Assembly (1) • Single Roof Beam Assemblies (2) Weather (QTY: 12) Stripping Tape should wrap around gap between Gables. Top View of Gables Seal the gap between the Gables using the Weather Stripping Tape...
Page 35
Step 15: Continued 35AA You will need for this page: 9204 Beam Brace (QTY: 4) Attach the Roof Beam Brace to the Gable with one (1) Bolt and Nut as shown and rotate to align with Roof Beam. Secure to Roof Beam with one (1) Bolt and Nut as shown.
Page 36
Roof Install Prep Page Use the information on this page to complete steps 16 thru 17. If Roof Beam holes do not line up with Roof Panel holes, shift the building from left to right. If this does not help, your building may not be level. Shim the corners until holes line up.
Page 37
Step 16: Roof Corners 37AA You will need for this page: 10700 80053 Right End Left End (QTY: 8) (QTY: 24) Secure the fi rst End Panel in rear of unit to the Main Roof Beam by placing a Screw in hole #1 (from the diagram below).
Step 17: Roof Assembly 38AA You will need for this page: 7571 7743 67545 Weather Roof Panel Roof Panel (QTY: 32) (QTY: 4) Stripping FASTEN TO RIDGE CAP (NEXT TWO PAGES) Begin Weather Stripping the roof ridge. Apply more of the weather stripping after each additional Panel is installed.
Page 39
Step 17: Continued 39AA You will need for this page: 10712 Ridge Cap (QTY: 8) • Bolts thru Ridge Cap pass thru slots where Continue to apply weather stripping. the Roof Panels overlap with the Panels next to them (labeled ribs #2 and #5 below). Attach Long Ridge Cap with four (4) Bolts and Nuts.
Page 40
Step 17: Continued 40AA You will need for this page: 10711 7571 (QTY: 44) Roof Panel Ridge Cap (QTY: 4) Continue to apply weather stripping. Install Roof Panels #9 and #10. Finish Weather Stripping the roof and cut the tape just past the end of the roof. Fold end of tape under roof edge.
Page 41
Step 18: Roof Trim 41AA You will need for this page: 80055 10710 (QTY: 4) (QTY: 8) (QTY: 4) Left Trim Right Trim Trim Cap (L) Trim Cap (R) Slide Peak Cap legs under Ridge Cap and secure Peak Cap with two (2) Bolts and Nuts on each end.
Page 42
Step 19: Door Installment 42AA You will need for this page: Assemblies from step 5: 10702 • Right Door Assembly (1) • Left Door Assembly (1) (QTY:4) (QTY:12) Ramp NEED AT LEAST TWO PEOPLE TO PERFORM THIS STEP! Using three (3) Flat Head Bolts and Nuts per Door Hinge, secure Doors to Door Jambs.
Page 43
ANCHORING OPTIONS... IMPORTANT: • If you have swing doors, they must hang and swing level before anchoring building. • Anchor your building at this time. See below for details on anchoring. • If you have purchased a Floor Frame Kit, you should install it at this time. •...
Page 44
CARE & MAINTENANCE... Exterior Care: For a long lasting fi nish, clean and wax the exterior surface. We recommend washing with a mild soap solution. DO NOT use power washing to clean your shed. Using a spray automotive type wax periodically on the exterior is highly recommended if you are in a high humidity or coastal climate region.
ARROW ACCESSORIES... ANCHOR KITS FLOOR FRAME KITS Model No. AK4 MODELS FB47410, FB5465, Anchor Kit contains heavy-duty steel FB106-A, FB109-A, FB1014-A, augers, 60' (18 m) of steel cable and and FBSDS108 4 cable clamps. No digging or concrete pouring, just insert cable under roof, A simple fl...
Need help?
Do you have a question about the CAM108 and is the answer not in the manual?
Questions and answers