F3 Field Service Manual – Level 1 Maintenance
Figure 29 Electronics Pack showing Main Wiring Loom in cut out (orange) and
Ribbon Cover (blue), Split grommet (red) and Bulkhead Cover (green) on Main
•
Ensure that the ribbon cable cover, split grommet and bulkhead cover are
threaded on the main wiring loom (in that order).
Note: Extreme care must be taken when plugging in the main wiring loom plug.
Wiring Loom
Page 26
Need help?
Do you have a question about the F3 and is the answer not in the manual?