HP 6100 Specification page 37

Enterprise virtual array
Hide thumbs Also See for 6100:
Table of Contents

Advertisement

QuickSpecs
Configuration Information and Configuration Rules
Step 5 - Hard Disk Drives
Drives are orderable two ways - either with the purchase of an array, or as add-on drives for arrays already installed. There are
different product numbers for Upgrade drives than Initial-installation drives
HP StorageWorks FC
Drives - Factory installation
HP StorageWorks
FATA Drives -
Factory installation
Step 6 - Cables
FC cable - Copper SFP The following cables are used with the M5314 and M5314A drive enclosure but are
4Gb Upgrade Cable Kit T he following cable kit is for use in upgrading the cables between the switches and the
FC Loop Switch Kits
NOTE: Four (4) disk drives, either size/type, are required per disk
enclosure per system. A minimum of eight (8) disk drives are
required per EVA4100/6100/8100.
NOTE: EVA4100 Starter Kits ship standards with 8 drives; you can
select any EVA supported drive as additional add-on capacity
beyond the original 8 drive EVA4100 Starter Kit configuration.
300 GB 10K rpm dual-port 2 Gb/s FC-AL 1-inch (2.54 cm) drive
146 GB 15K rpm dual-port 2/4 Gb/s FC-AL 1-inch (2.54 cm)
drive
300 GB 15K rpm dual-port 2/4 Gb/s FC-AL 1-inch (2.54 cm)
drive
450 GB 15K rpm dual-port 2/4 Gb/s FC-AL 1-inch (2.54 cm)
drive
500 GB FATA disk dual-port 2 Gb FC Hybrid disk drive factory
integrated
1TB FATA disk dual-port 2 Gb FC Hybrid disk drive factory
integrated
*0D1 will appear after this part number on your sales order
indicating factory integration
NOTE: TThere is a minimum order requirement, with the first
installation of FATA add-on drives on an EVA, a minimum of 8 FATA
drives are required to create the new NearOnline disk group.
not necessary for new installations. These cables are for use inside the cab between the
controllers and drive enclosures if replacement cables are required.
Cable FC Copper SFP .6m
Cable FC Copper SFP 2m
M5314B enclosures for older EVAs to the 4Gb EVA4000/6000/8000 and
EVA4100/6100/8100.
HP StorageWorks 4Gb Cable Kit
This option is mandatory when upgrading the EVA4x00 2C1D to
and EVA6x00 with 5 shelves or higher.
HP EVA-A Dual Loop Switch Option
Contains two FC loop switches, mounting hardware and cables.
NOTE: This kit is mandatory when upgrading the 4Gb EVA4000-A or EVA4100 to 5
shelves or higher (creating an 4Gb EVA6000 or EVA6100).
3U spare space is required to install the FC Loop Switch Kit.
The EVA8000-A or EVA8100 2C2D customers have the option to convert to a 2C6D -
or 2C12 with the installation, by trained Service Engineers, of the FC Loop Switch
Option. This option is mandatory when upgrading the 2C2D to 5 shelves or higher.
DA - 12745
Worldwide QuickSpecs — Version 5 — 2.26.2008
HP StorageWorks Enterprise Virtual Array Family
Not for use in
EMEA Only
EMEA
364622-B23*
364622-B22*
364621-B23*
364621-B22*
AG425B*
AG425A*
AG804B*
AG804A*
370790-B23*
370790-B22*
AG883B*
AG883A*
321624-B21
324394-B21
AG311A
AD557B
Page 37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents