Table of Contents

Advertisement

.32-.36 AND .46 ASSEMBLY INSTRUCTIONS
ERGO SPECIFICATIONS
Overall Length
Overall Height
Main Rotor Diameter
46.5"
Tail Rotor Diameter
16.38"
Gear Ratio
48.5" (.32-.36)
Gross Weight
50" (.46 3D)
Heli Division
9.17"
9.78:1:5.18
6.75-7.0 lbs.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the JR Ergo and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for JR ProPo JR Ergo

  • Page 1 .32-.36 AND .46 ASSEMBLY INSTRUCTIONS ERGO SPECIFICATIONS Overall Length 46.5" Tail Rotor Diameter 9.17" Overall Height 16.38" Gear Ratio 9.78:1:5.18 Main Rotor Diameter 48.5" (.32-.36) Gross Weight 6.75-7.0 lbs. 50" (.46 3D) Heli Division...
  • Page 2 INTRODUCTION Congratulations on your purchase of the JR Ergo helicopter kit. models. For further information, you can contact the AMA at: This kit has been both engineered and manufactured by JR with help from some Academy of Model Aeronautics of Japan’s top R/C helicopter engineers (now employed by JR).
  • Page 3: Table Of Contents

    INDEX Section Description Page Section Description Page Tools ..........4-6 Tail Gear Case Assembly .
  • Page 4 (not supplied in kit) ITEMS REQUIRED TO COMPLETE THE JR ERGO 1. RADIO SYSTEM REQUIREMENTS (NOT INCLUDED): 6-channel or greater R/C helicopter system with 5 servos, 1000 mAh receiver battery and gyro.
  • Page 5 (Webra .33 Heli Engine Shown) (Thunder Tiger Pro .46 Heli Engine Shown) (JRP960079 Ergo .46 Muffler Shown) 3. BUILDING SUPPLIES (NOT INCLUDED): The following items are needed to complete the assembly of the JR Ergo: Silicone Fuel Tubing Fuel Filter Whip Antenna...
  • Page 6: Tools

    4. TOOLS NEEDED TO ASSEMBLE THE JR ERGO (NOT INCLUDED): Nut Drivers: 5mm, 7mm Needle Nose Pliers Scissors Phillips Screwdirver Drill and Drill Bits Small Hammer X-Acto Knife Metric Ruler Blade Balancer Allen Wrenches: 1.5, 2.0, 2.5, 3.0mm 5. FIELD EQUIPMENT REQUIRED (NOT INCLUDED):...
  • Page 7: Hardware Identification

    HARDWARE IDENTIFICATION There are many various sizes and shapes of hardware included in this kit. All of the hardware, screws, nuts, etc., contained in the Ergo kit are described in Prior to assembly, please be careful to identify each screw by matching it to the the following A, B, C manner: full size screw outlines included in each step.
  • Page 8: Clutch Bell/Start Shaft Assembly

    CLUTCH BELL/START SHAFT ASSEMBLY Starter Hex Adaptor ..1 pc Complete Assembly 3x4mm Set Screw Use Threadlock * When installing the Start Shaft Bearing Block Assembly, be sure the Bearing Block is positioned so the Bushing faces upward toward the starter hex adaptor, with the bearing toward the Clutchbell Assembly.
  • Page 9: Control Ball Installation

    CONTROL BALL INSTALLATION Mixing Lever (3 pc) 2x8mm Flat Head Screw (Prepare 3 Sets) Use Threadlock ..1 pc 2x8mm Flat Head Screw 2mm Nut Roll Bell Crank ..8 pc Steel Joint Ball 2x10mm Flat Head Screw 2mm Nut Steel Joint Ball ..9 pc Steel Joint Ball ..3 pc...
  • Page 10: Elevator Arm Assembly

    ELEVATOR ARM ASSEMBLY Elevator Arm Rear Elevator Arm Front ..2pc Swashplate A 2x8mm Flat Head Screw Arms ..2pc Steel Joint Ball ..2pc Elevator Arm Pin Steel Joint Ball Steel Joint Ball 2x8mm Flat Head Screw 2x8mm Flat Head Screw Elevator Arm Pin Caution: Be sure to note correct Swashplate A Arm installation direction.
  • Page 11: Upper Main Frame Section Assembly

    UPPER MAIN FRAME SECTION ASSEMBLY Upper Main Shaft Bearing Block Use Threadlock On Position so the side Bearing Flush All Screws with Flange of the bearing block that has the bearing ..21 pc Bearing flush with the flange 3x8mm Socket Head Bolt is upward.
  • Page 12: Upper Main Frame Control Lever Installation

    UPPER MAIN FRAME CONTROL LEVER INSTALLATION Use Threadlock Elevator Arm Bushing Note: Be sure to install the Elevator Nylon Washer Arm Units in their proper Nylon Washer location as there is a “Front” Elevator Arm Bushing 3x8mm Socket Head Bolt and a “Rear”...
  • Page 13: Lower Main Frame Assembly

    LOWER MAIN FRAME ASSEMBLY Lower Main Frame 2.6x8mm Self Tapping Screw (4 pc) ..4pc 3x8mm Socket Head Bolt ..4 pc 3mm Lock Nut ..4 pc 3mm Lock Nut (4 pc) 2.6x8mm Self Tapping Screw Lower Frame Angle (2 pc) 2.6x8mm Self Tapping Screw Servo Mounting Plate 3x8mm Socket Head Bolt (4 pc)
  • Page 14: Front Radio Bed/Gyro Mounting Plate Installation

    FRONT RADIO BED/GYRO MOUNTING PLATE INSTALLATION Gyro Mounting Plate ..6 pc Use Threadlock 3x10mm Socket Head Bolt Front Radio Bed ..2 pc 3x18mm Set Screw ..2 pc Body Mounting Standoff Long Body Mounting Standoff Long 3x10mm Socket Head Bolt (6 pc) 3x18mm Set Screw (2 pc) Body Mount Standoff, Long 3x10mm Socket...
  • Page 15: Upper/Lower Main Frame Assembly Attachment

    UPPER/LOWER MAIN FRAME ASSEMBLY ATTACHMENT Use Threadlock On ..12 pc All Screws 3x22mm Socket Head Bolt ..6 pc Main Frame Standoff, 32mm ..12 pc Main Frame Spacer, 12.5mm Main Frame Spacer, 12.5mm (12 pc) Main Frame Standoff, 32mm (6 pc) 3x22mm Socket Head Bolt (12 pc) 3x22mm Socket Head Bolt...
  • Page 16: Main Drive Gear/Autorotation Assembly

    MAIN DRIVE GEAR/AUTOROTATION ASSEMBLY 3x6mm Socket Head Bolt (4 pc) [Tighten equally to prevent warping of Main Drive Gear] Use Threadlock Main Drive Gear ..4 pc 3x6mm Socket Head Bolt Autorotaion Assembly MAIN DRIVE GEAR/AUTOROTATION ASSEMBLY INSTALLATION Main Shaft Collar Use Threadlock 4x4mm Set Screw (4 pc) ..4 pc...
  • Page 17: Landing Gear Assembly Installation

    LANDING GEAR ASSEMBLY INSTALLATION 3x12mm Socket Head Bolt (4 pc) ..4 pc 4x4mm Set Screw ..4 pc 3x12mm Socket Head Bolt ..4 pc 3mm Flat Washer 3mm Flat Washer (4 pc) ..4 pc Landing Gear Dampers (4 pc) 3mm Lock Nut 3mm Lock Nut (4 pc) Landing Strut...
  • Page 18: .46 Cooling Fan Installation

    3-4.1 .46 COOLING FAN INSTALLATION Nut Supplied with Engine Note: If you are building the Ergo .32-.36 Version, proceed to Step 3-5. Note: It will not be necessary to use the four 3x5mm Socket Head Bolts included in this screw bag. Note: It will be necessary to shorten the Crankshaft of the engine to allow clearance.
  • Page 19: .46 Engine Mount Attachment

    3-5.1 .46 ENGINE MOUNT ATTACHMENT Engine Mount .46 Fan Assembly: .46 Use Threadlock ..4 pc 3mm Serrated 3x15mm Socket Head Bolt Washer (4 pc) ..4 pc 3mm Flat Washer ..4 pc 3mm Serrated Washer Motor Mount Direction: Motor Mount Direction: Thunder Tiger O.S.
  • Page 20: Engine Installation (All)

    ENGINE INSTALLATION (ALL) ..4 pc 3x10mm Socket Head Bolt ..4 pc 3mm Flat Washer 3mm Flat Washer (4 pc) 3x10mm Socket Head Bolt (4 pc) Correct Incorrect Adjust the height and position of the Engine as shown so the bottom of the Clutch *It is highly recommended that you insert Assembly is flush with the bottom of the Clutch Bell.
  • Page 21: Rotor Head Hub Assembly

    ROTOR HEAD HUB ASSEMBLY 3x6mm Socket Head Bolt Use Threadlock Head Button ..1 pc 3x6mm Socket Head Bolt ..2 pc 3x8mm Socket Head Bolt 3x8mm Socket Head Bolt (2 pc) Phase Adjustment Ring Main Rotor Hub (insert onto base of Main Rotor Hub) MAIN BLADE HOLDER ASSEMBLY Steel Joint Ball Two Sets Required...
  • Page 22: Main Blade Holder/Seesaw Attachment

    MAIN BLADE HOLDER/SEESAW ATTACHMENT ..2 pc 3x5mm Button Head Bolt Blade Spindle Shaft ..2 pc 4mm Lock Nut Damper Rubber (2 pc) ..2 pc Seesaw Spacer (Steel) Blade Holder Spacer Seesaw Spacer (Steel) (Bevel Inward) (2 pc) ..2 pc (2 pc) Blade Holder Spacer A Use Threadlock 4mm Lock Nut (2 pc)
  • Page 23: Swashplate/Washout Assembly Installation

    SWASHPLATE/WASHOUT ASSEMBLY INSTALLATION *Washout Assembly Swashplate Assembly Upper Swashplate Ring Connect the two Washout Links to the correct upper Swashplate Balls as shown. Complete Assembly *SWASHOUT ASSEMBLY INSTALLATION When installing the washout assembly be sure the long flange of the mixing base is positioned downward (toward the swashplate) with the short portion facing upward.
  • Page 24: Rotor Head Installation

    ROTOR HEAD INSTALLATION ..1 pc 3x18mm Socket Head Bolt Completed Rotor Head Assembly ..1 pc 3mm Lock Nut 3mm Lock Nut 3x18mm Socket Head Bolt Rotor Hub Pin Washout Base Note: Be sure to engage thePhase Adjusting Ring into the Washout Base Groove before securing the Rotor Head Assembly in place.
  • Page 25: Flybar Installation

    FLYBAR INSTALLATION Flybar Control Arm (2 pc) Use Threadlock 4x4mm Set Screw *Flybar Bushings (2 pc) (2 pc) ..2 pc 4x4mm Set Screw * Be sure to insert Flybar Bushings into the Seesaw Shaft before inserting Flybar. Flybar Flybar Centering Note: Center the Flybar in the Seesaw Shaft before securing the two Flybar Control Arms.
  • Page 26: Rotor Head/Swashplate Control Rod Installation

    ROTOR HEAD/SWASHPLATE CONTROL ROD INSTALLATION *Double Link A (2 pc) (Washout Arm to Main Blade Holder) Pre-Assembled Control Rod Identification: Washout Arm to Flybar Control Arm (1 Piece Double Link) 47mm Swashplate to Roll Bellcrank Note: Ergo .46 3D Kit (2.3mmx30mm Threaded Rod) Your Ergo .46 3D Kit includes an additional set of Double Links (B Style #960081).
  • Page 27: Tail Output Shaft/Pulley Assembly

    TAIL OUTPUT SHAFT/PULLEY ASSEMBLY Complete Assembly ..1 pc Spring Pin Tail Output Shaft Hammer Spring Pin Short Distance Note correct direction of Tail Edge of Work Bench Output Shaft during assembly. Long Distance Tail Case Pulley TAIL GEAR CASE ASSEMBLY 3x12mm Self Tapping Screw 3x12mm Self...
  • Page 28: Tail Center Hub Assembly

    TAIL CENTER HUB ASSEMBLY * Be certain to apply Locktite to the two 3x3mm Set Screw (2pc) 3x3mm set screws and attach securely to the tail output shaft so the set screws Tail Center Hub engage into the tail output shaft hole. Failure to secure this assembly properly can result in tail rotor failure during flight.
  • Page 29: Tail Pitch Control Lever Installation

    TAIL PITCH CONTROL LEVER INSTALLATION ..1 pc 2x8 Flat Head Screw ..1 pc 2x20mm Socket Head Bolt ..1 pc 2mm Flat Washer ..1 pc Steel Joint Ball ..1 pc Tail Lever Bushing Snap Tail Pitch Control Lever Onto Ball 2mm Flat Washer Steel Joint Ball Tail Lever Bushing 2x8mm Flat...
  • Page 30: Tail Boom Carrier Installation

    TAIL BOOM CARRIER INSTALLATION 3mm Lock Nut Tail Boom Carrier (L&R) ..4 pc 3x15mm Socket Head Bolt 3mm Lock Nut ..2 pc 3x40mm Socket Head Bolt ..6 pc 3mm Lock Nut * Do not fully tighten at this time. These bolts will be secured in Step 5-10.
  • Page 31: Tail Boom Brace Assembly

    TAIL BOOM BRACE ASSEMBLY Tail Brace Connector ..1 pc 2.6x12mm Socket Head Bolt 2.6x15mm Socket Head Bolt ..1 pc 2.6x15mm Socket Head Bolt 2.6x12mm Socket Head Bolt Tail Brace Tube Tail Brace T End 5-10 TAIL BOOM BRACE INSTALLATION ..2 pc 3x8mm Socket Head Bolt 3mm Lock Nut ..1 pc...
  • Page 32: Upper Servo Tray Installation

    UPPER SERVO TRAY INSTALLATION 3x8mm Socket Head Bolt (4 pc) Upper Servo Tray ..4 pc 3x8mm Socket Head Bolt RADIO INSTALLATION SUGGESTIONS Be sure to install four rubber servo grommets and eyelets to each servo prior to It is suggested that both the receiver and gyro amplifier be isolated from vibration installation.
  • Page 33: Servo/Switch Harness Installation

    SERVO/SWITCH HARNESS INSTALLATION Inner Holes are for JR Servos 2.6x12mm Self Tapping Screw 2.6mm Flat Washer ..20 pc 2.6x12mm Self Tapping Screw ..20 pc 2.6mm Flat Washer (4 Per Servo) * Note correct Servo Output Shaft Outer Holes are for Futaba Servos orientation dring installation.
  • Page 34: Tail Control Rod Assembly

    TAIL CONTROL ROD ASSEMBLY Thread Link 8mm onto Control Rod Tail Control Rod Bushings (5 pc) Universal Link (2 pc) ..5 pc Tail Control Rod Bushing Tail Control Rod ..2 pc Universal Link Thread Link 8mm onto Control Rod TAIL CONTROL ROD INSTALLATION Tail Contol Rod Guide (4 pc) Tail Control Rod Clip located on Main Fram...
  • Page 35: Gyro/Receiver/Battery Installation

    GYRO/RECEIVER/BATTERY INSTALLATION Caution: Be certain when installing the Gyro to the Gyro Mounting Plate that it does not come in contact with the frame of the helicopter, and Gyro that the surfaces are free from oil, residue, etc. Clean if neccessary to insure proper adhesion.
  • Page 36: Radio System Preparation

    RADIO SYSTEM PREPARATION The following preparations are suggested for use with JR radio systems. These suggested adjustments are necessary to insure correct installation and However, these procedures are applicable to most other brand radio systems. attachment of the control linkages and servo horns. TRANSMITTER PREPARATION Set all trim levers, trim knobs and switches to the neutral or zero previously to another model, reset all functions and input values to the...
  • Page 37: Aileron Linkages

    AILERON LINKAGES A Special Note To Beginners: It is suggested that the maximum travel limits for aileron, elevator, pitch and rudder controls be reduced to 70%..1 pc Note: Attach the steel joint ball to the correct hole as shown below: 2x8mm Flat Head Screw Servo Horn ..1 pc...
  • Page 38: Collective Linkage Installation

    COLLECTIVE LINKAGE INSTALLATION Note: Make certain that the Collective Servo Reversing Directions Servo is in the neutral or hover Reverse 2x8mm Flat Head Screw 90° position before securing the Futaba Reverse Servo Horn to the Servo. Steel Joint Ball Servo Horn 2mm Hex Nut 2.3x35mm All Threaded Rod 20mm...
  • Page 39: Throttle Linkage Installation (All)

    THROTTLE LINKAGE INSTALLATION (ALL) 2x8mm Flat Head Screw ..1 pc 2x8mm Flat Head Screw Steel Joint Ball Servo Horn ..1 pc Steel Joint Ball 2mm Hex Nut ..1 pc 2mm Hex Nut Servo Reversing Directions Reverse High Futaba Reverse Throttle Throttle Note: Make sure that the Throttle Trim...
  • Page 40: Body Assembly/Canopy Attachment

    BODY ASSEMBLY/CANOPY ATTACHMENT Rubber Grommets (4 pc) Body Note: It will be necessary to trim away the unwanted plastic *Canopy (Trim prior to attachment) off the canopy and side 2.3x8mm Self window areas using an Tapping Screw X-Acto knife. (5 pc) Drill four 15/64"...
  • Page 41: Main Rotor Blade Balancing

    MAIN ROTOR BLADE BALANCING Main Rotor Blades Step 1 Step 2 Drinking Glass (2 pc) Final Static Balancing Spanwise C.G. Balancing To static balance the main rotor blades, it is suggested to either Place each rotor blade on a sharp edge of a table as attach each blade to a “seesaw”...
  • Page 42: Servo Adjustment And Radio Set Up

    FINAL SERVO ADJUSTMENT AND RADIO SET UP Now that the radio system is completely installed into the helicopter, it is A. Pitch Curve Adjustment necessary to check and adjust the following: Using a pitch gauge (optional) set the low, mid and high stick pitch settings as shown in the diagram below.
  • Page 43 B. Throttle Curve Settings Below are several examples of possible throttle curves during various flight conditions. Since throttle curves can vary greatly due to engine and muffler combinations, it will be necessary to fine tune and adjust these values during test flights to achieve a constant main rotor RPM. Stunt &...
  • Page 44: Data Sheets

    XF622 DATA SHEET #1 ERGO .32/.46 (INITIAL SET-UP) FACTORY PRE-SET GEAR FACTORY PRE-SET PITCH NORM NORM NORM NORM NORM NORM REVERSE SW SUB-TRIM Adjust so that no trim is required Adjust for Full +80% +80% +100% +150% TRAVEL ADJUST Power Adjust for –80% –80%...
  • Page 45 XP642 DATA SHEET #1 ERGO .32/.46 (INITIAL SET-UP) * Note: Before flying, confirm that all controls Modulation S-PCM • Z-PCM • PPM (FM) function in their proper direction. Model Number Model Name CHANNEL THR (1) AIL (2) ELE (3) RUD (4) GER (5) PITCH (6) NORM...
  • Page 46 XP642 DATA SHEET #2 ERGO .32/.46 (INITIAL SET-UP WITH 3D PITCH/THROTTLE CURVE) Modulation S-PCM • Z-PCM • PPM (FM) * Note: Before flying, confirm that all controls function in their proper direction. Model Number Model Name CHANNEL THR (1) AIL (2) ELE (3) RUD (4) GER (5)
  • Page 47 XP-783 DATA SHEET MODEL NO. ERGO .32/.46 (INITIAL SET-UP) MODEL NAME ERGO .32/.46 MODULATION S-PCM • Z-PCM • PPM AILE ELEV RUDD AUTO ST-1 INH • ACT 90 % 70 % (POS.1) ST-2 INH • ACT D/R • R 100% 100% 100% AUX 2 INPUT...
  • Page 48 MODEL NO. (84) _____________________________________ PCM10SX DATA SHEET ERGO .32/.46 (INITIAL SET-UP) MODEL NAME (81) ERGO .32/.46 MODULATION (85) SPCM-ZPCM-PPM THRO AILE ELEV RUDD GEAR PITCH AUX2 AUX3 AUX4 AUX5 REVERSE SW (11) Adjust for L 80% D 80% L 100% +150% Full Power TRAVEL ADJUST...
  • Page 49: Data Sheets

    PCM10SX DATA SHEET ERGO .32/.46 (INITIAL SET-UP) CONTINUED 50% Power 100% Power • —— —— HOV.SEL THRO • CURVE 100% Power 40% Power 50% Power (18) • 100% Power 50% Power 100% Power TH,TRIM=SLOW HOV.T=CENTER • • -2° Pitch 5° Pitch 10°...
  • Page 50: Final Pre-Flight Check

    FINAL PRE-FLIGHT CHECK Once all assemblies have been completed, please review the following and that each servo horn is secured with a servo horn mounting screw. suggestions before attempting initial flights. • Verify that the gyro is operational and compensating in the correct direction (detailed in Step 8, page 42).
  • Page 51: General Maintenance

    GENERAL MAINTENANCE Engine Check to insure that all universal links fit freely but securely to the control balls. After each day of flying, fully drain the fuel tank. Then, start the engine If there is excessive play noted, replace the universal link in question. and let it idle until the engine and the fuel line are completely burned off.
  • Page 52 ROTOR HEAD/SWASHPLATE/WASHOUT ASSEMBLY 960062 980049 960068 960070 983003 960064 983004 960071 980023 970029 981004 960066 960063 960067 960069 960065 970030 970002 970013 960013 970011 960060 960012 960059 960014 960075 970010 970006 960081 970004 970001...
  • Page 53: Rotor Head/Swashplate/Washout Assembly Parts List

    ROTOR HEAD/SWASHPLATE/WASHOUT ASSEMBLY PARTS LIST PART # DESCRIPTION QUANTITY COMMENTS /ADDITIONAL CONTENTS 960012 Washout Assembly Complete w/all Components 960013 Washout Base 960014 Swashplate Assembly 3 - 2x8mm Flat Head Screws 4 - 2x10mm Flat Head Screws 7 - Steel Joint Balls 960059 Flybar Paddles 2 - 3mm Lock Nuts...
  • Page 54 START SHAFT/CLUTCH/ENGINE ASSEMBLY 960007 96005 960016 960018 960003 970009 960004 960011 960018 960006 960019 960078 (optional) 960008 960039 960040 950032...
  • Page 55: Start Shaft/Clutch/Engine Assembly Parts List

    START SHAFT/CLUTCH/ENGINE ASSEMBLY PARTS LIST PART # DESCRIPTION QUANTITY COMMENTS /ADDITIONAL CONTENTS 960003 Clutch Assembly Complete w/One-Way Bearing 2 - 3x5mm Socket Head Bolts 960004 Clutch Bell Assembly Complete w/Pinion Gear, Clutch Lining and Oiless Bushing 960005 Starter Hex Adaptor Complete w/One 4x4mm Set Screw 960006 Start Shaft Assembly...
  • Page 56 CYCLIC MIXING ARMS/ELEVATOR/AILERON CONTROL ARMS 960024 970002 980049 960025 970015 960023 970003 970003 970019 970018 970017 970012 970014 980049 960015 970004 960076 960020 980049 970016 970016 960022 960021 960022...
  • Page 57: Cyclic Mixing Arms/Elevator/Aileron Control Arms Parts List

    CYCLIC MIXING ARMS/ELEVATOR/AILERON CONTROL ARMS PARTS LIST PART # DESCRIPTION QUANTITY COMMENTS /ADDITIONAL CONTENTS 960015 Roll Bellcrank Complete w/Bushing 2 - Steel Joint Balls 2 - 2x8mm Flat Head Screws 2 - 2mm Hex Nuts 960020 Elevator Arm: Front Complete w/Bushing Steel Joint Ball 2x8mm Flat Head Screw 960021...
  • Page 58 UPPER MAIN FRAME/RADIO TRAY/BODY SET 960072 982002 982001 960031 970004 970005 960077 960002 970008 970022 960035 960009 960001 970005 960017 970020 960029 970024...
  • Page 59: Upper Main Frame/Radio Tray/Body Set Parts List

    UPPER MAIN FRAME/RADIO TRAY/BODY SET PARTS LIST PART # DESCRIPTION QUANTITY COMMENTS /ADDITIONAL CONTENTS 960001 Autorotation Assembly Complete w/Four 3x6mm Socket Head Bolts 960002 Main Drive Gear 88T Complete w/Four 3x6mm Socket Head Bolts 960009 Main Rotor Shaft 960017 Main Shaft Bearing Block Complete w/Bearing 960029 Upper Main Frame...
  • Page 60 LOWER MAIN FRAME/LANDING GEAR/FUEL TANK 960030 960026 960027 960030 970022 960010 970021 960027 960028 970022 960117 960038 960039 980013 960037 960040 980036 980015 960036 960033 960038 960034 970023...
  • Page 61: Lower Main Frame/Landing Gear/Fuel Tank Parts List

    LOWER MAIN FRAME/LANDING GEAR/FUEL TANK PARTS LIST PART # DESCRIPTION QUANTITY COMMENTS /ADDITIONAL CONTENTS 960010 Cooling Fan Shroud 4 - 2.6x8mm Self Tapping Screws 960026 Gyro Mounting Plate 4 - 3x10mm Socket Head Bolts 960027 Lower Frame Angles 960028 Front Radio Bed 960030 Lower Main Frame 960032...
  • Page 62 TAIL BOOM/TAIL BRACE/TAIL BOOM CARRIER 960048 960047 983002 960045 960046 960044 960046 983001 960042 960041 960043...
  • Page 63: Tail Boom/Tail Brace/Tail Boom Carrier Parts List

    TAIL BOOM/TAIL BRACE/TAIL BOOM CARRIER PARTS LIST PART # DESCRIPTION QUANTITY COMMENTS /ADDITIONAL CONTENTS 960041 Tail Brace Set 1 - Tail Brace Tube 1 - Tail Brace Connector 1 - Tail Brace T End 1 - 2.6x12mm Socket Head Bolt 1 - 2.6x15mm Socket Head Bolt 960042 Tail Brace Tube...
  • Page 64 TAIL CASE/TAIL BLADE HOLDERS/TAIL PITCH PLATE 960051 960056 970026 960052 960058 970028 960050 970222 960057 960053 970027 960049 960055 981003 981003 960054 980007 970001 960053 .32-.36 AND .46 ASSEMBLY INSTRUCTIONS 960074 ERGO SPECIFICATIONS Overall Length 46.5" Tail Rotor Diameter 9.17" Overall Height 16.38"...
  • Page 65: Tail Case/Tail Blade Holders/Tail Pitch Plate Parts List

    TAIL CASE/TAIL BLADE HOLDERS/TAIL PITCH PLATE PARTS LIST PART # DESCRIPTION QUANTITY COMMENTS /ADDITIONAL CONTENTS 960045 Tail Fin Set 1 - Horizntal Fin 1 - Vertical Fin 3 - 3x12mm Self Tapping Screws 2 - 3x12mm Socket Head Bolts 2 - 3mm Lock Nuts 960049 Tail Drive Belt 960050...
  • Page 66 Heli Division Revised 3/4/97...

This manual is also suitable for:

Ergo .32Ergo .36Ergo .46

Table of Contents