Operating Instructions - RBI LCD Series Installation & Operation Manual

Lcd series finned copper gas boilers & water heaters
Hide thumbs Also See for LCD Series:
Table of Contents

Advertisement

Page 26
Ignition Trial:
1. Blower delay timer TD1 times out and the flame
sense module, FSM, is energized.
2. The FSM starts the 10-second ignition trial,
energizing relay R7, the pilot solenoid valve and the
spark generator.
3. The pilot valve and spark generator are energized
for the 10-second ignition trial. When the pilot flame
is sensed, the FSM sends 24VAC to its MV terminal
energizing the safety and low fire-side of the main
solenoid valves and relay R8, de-energizing R7 and
the spark generator.
4. If the pilot flame isn't sensed, the FSM de-energizes
the PV terminal and waits 5 minutes before initiating
the second ignition trial. The blower(s), pump(s) and
optional power venter will remain on during this time.
5. On CSD-1 equipped units the blower(s) and optional
power venter will shut down and the boiler/water
heater will lock if the second ignition trial fails. The
unit must then be manually reset by depressing the
reset button on the left jacket panel.
6. On non-CSD-1 equipped units the FSM will wait 10
minutes after the second unsuccessful ignition
attempt then begin the ignition process described
in step 3 above. The FSM will continue to cycle the
unit through steps 3, 4 and 6 until the unit lights or
the demand for heat is removed.
Main Burner
Once the pilot is proven, the FSM sends 24VAC to its
MV terminal energizing the safety and low-fire side of
the main solenoid valves.
Normal Operation
• Staging is controlled by the return water aquastat.
Relays R2 and R2R are energized by the return water
aquastat when more heat input is required. The
hi-speed windings of the blower(s) are energized.
• Relay R9 is energized when the hi-fire pressure switch
senses adequate air pressure to sustain hi-fire
combustion. R9 energizes the hi-fire side of the pilot
and main solenoid valves.
• Stage 1 will operate first and last.
NOTE: For a change from stage 1 to 2, a 7 second
LCD time delay is provided in the pressure switch
switching circuit (PD6). The time delay provides a
hold state that allows the blower to reach full speed
and close the high fire pressure switch before it is
energized to confirm proper air flow.
LCD INSTALLATION AND OPERATION INSTRUCTIONS
Demand Satisfied:
1. When the demand for heat is satisfied the operator
switch will open, de-energizing relays R2, R2R, R8,
R9, TD1, TD3, TD4, the FSM and the pilot, main
and safety solenoid valves. The pilot and main
flames are extinguished.
2. The blower delay timer TD3 starts the 80 second
post-purge timing. The blower(s) shut(s) off when
TD3 times out.
3. The pump delay timer TD4 starts the post-purge
timing. The pump(s) remain on for 0.1 to 10 minutes
then shut(s) off when TD4 times out.
High Limit, Low Water Flow, Low Gas Pressure, High
Gas Pressure, Power Venter Interlock Faults
1. Electrical power to the gas valves, blower(s) and
power venter will be interrupted if any safety is
tripped.
2. The manual reset high limit can be reset by
depressing the rubber plug in the front top jacket
panel.
Low Air (Blocked Flue/Air Inlet)
• The pressure switches will monitor blower airflow.
• Air monitoring will begin at pre-purge. If a low air
condition is present, power will not be supplied to the
FSM. The blower(s) will remain on.

OPERATING INSTRUCTIONS

FOR YOUR SAFETY READ BEFORE OPERATING
POUR VOTRE SÉCURITÉ LISEZ AVANT DE METTRE
EN MARCHE
A. This appliance is equipped with an ignition device
which automatically lights the pilot. Do not try to light
the pilot by hand.
Cet appareil est muni d'un dispositif d'allumage qui
allume automatiquement la veilleuse. Ne tentez pas
d'allumer la veilleuse manuellement.
B. BEFORE OPERATING smell all around the
appliance area for gas. Be sure to smell next to the
floor because some gas is heavier than air and will
settle on the floor.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents