Preparation Of Piping - LG 20k Installation Manual

Floor standing type air conditioner
Table of Contents

Advertisement

Installation of Unit

Preparation of Piping

Main cause of gas leakage is defect in flaring
work. Carry out correct flaring work in the
following procedure.
1. Cut the pipes and the cable.
• Use the accessory piping kit or the pipes
purchased locally.
• Measure the distance between the indoor
and the outdoor unit.
• Cut the pipes a little longer than measured
distance.
• Cut the cable 1.5m longer than the pipe
length.
2. Burrs removal
• Completely remove all burrs from the cut
cross section of pipe/tube.
• Put the end of the copper tube/pipe to
downward direction as you remove burrs in
order to avoid to let burrs drop in the tubing.
3. Putting nut on
• Remove flare nuts attached to indoor and
outdoor units, than put them on pipe/tube
having completed burr removal.
(Not possible to put them on after flaring work)
4. Flaring work
• Carry out flaring work using dedicated
flaring tool for R-22 as shown below.
Outside diameter
mm
inch
Ø6.35
1/4
Ø9.52
3/8
Ø12.7
1/2
Ø15.88
5/8
Ø19.05
3/4
Firmly hold copper tube in a bar(or die) as
indicated dimension in the table above.
5. Check
• Compare the flared work with figure below.
• If flare is noted to be defective, cut off the
flared section and do flaring work again.
12 Floor Standing type Air Conditioner
Copper
tube
Bar
A
mm
1.1~1.3
1.5~1.7
1.6~1.8
1.6~1.8
Smooth all round
1.9~2.1
Even length
all round
Slanted Uneven Rough
90°
Pipe
Reamer
Point down
Flare nut
Copper tube
Bar
"A"
Copper pipe
Clamp handle
Inside is shining without scratches
= Improper flaring =
Inclined
Surface
damaged
Handle
Yoke
Cone
Red arrow mark
Cracked Uneven
thickness

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

28k48k30k40k50k55k ... Show all

Table of Contents