Pfaff Creative 4.0 Owner's Manual page 95

Creative 4.0
Hide thumbs Also See for Creative 4.0:
Table of Contents

Advertisement

Embroidery stitch editor - example
1.
Enter embroidery edit.
2.
To create a sequence, open sequencing by
touching the icon (F) on the task bar. Select
stitch number 4.4.7, then 4.3.13, 4.2.2, 4.3.13.
Mirror the last inserted stitch end to end. Insert
stitch 4.3.17, 4.3.13, 4.2.2, 4.3.13. Mirror the last
inserted stitch and nally add stitch 4.4.7.
3.
Close sequencing by touching the icon on the
task bar. The sequence is loaded to embroidery
edit.
4.
Deselect the sequence by touching outside
the design on the screen, or step by using the
arrows.
5.
Open sequencing once again. Select stitch
number 4.1.2.
6.
Long touch the duplicate icon. In the pop-up
that appears, enter 7 and touch OK for a total
of eight copies.
7.
Close sequencing to load the second sequence
to embroidery edit.
8.
Touch the wheel center icon when move is
selected, to move the new sequence to the
center of the hoop. Move 7.5mm to the right.
9.
Open Embroidery stitch editor (23).
10. Decrease the width of the second sequence to
8mm.
11. Toggle to the rst sequence, using the arrows
(A). Increase the length of the sequence to t
the second sequence, 169,1mm. Increase the
density to 0.6.
12. Close Embroidery stitch editor. Select the
second sequence and duplicate. Mirror side to
side. Center the copy and move 7.5mm to the
left of the rst sequence.
F
A
8:11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents