Lennox EL296UHE Installation Instructions Manual page 35

Elite el296uhe series gas furnace upflow / horizontal air discharge
Hide thumbs Also See for EL296UHE:
Table of Contents

Advertisement

Field Provided Drain Components
Elbow
Tubing
FIGURE 52
CAUTION
Do not use copper tubing or existing copper conden­
sate lines for drain line.
6 - If unit will be started immediately upon completion of
installation, prime trap per procedure outlined in Unit
Start-Up section.
Condensate line must slope downward away from the
trap to drain. If drain level is above condensate trap,
condensate pump must be used. Condensate drain
line should be routed within the conditioned space to
avoid freezing of condensate and blockage of drain
line. If this is not possible, a heat cable kit may be used
on the condensate trap and line. Heating cable kit is
available from Lennox in various lengths; 6 ft. (1.8m) -
kit no. 26K68; 24 ft. (7.3m) - kit no. 26K69; and 50 ft.
(15.2m) - kit no. 26K70.
CONDENSATE TRAP LOCATIONS
(Unit shown in upflow position with remote trap)
Field ProvidedVent
Min. 1" Above Condensate
Drain Connection
1" Min.
2" Max.
*5' max.
PV C PipeOnly
Trap can be installed a
maximum 5' from furnace
*Piping from furnace must slope down a minimum of
1/4" per ft. toward trap.
FIGURE 53
Barbed Fitting
Hose Clamp
T o Drai n
Page 35
EL296UHE With Evaporator
Coil Using A Separate Drain
Field Provided Vent
(1" min. 2" max. above
condensate connection)
Condensate
Drain Connection
FIGURE 54
Condensate Trap With Optional Overflow Switch
From Evaporator Coil
Horizontal Furnace 4" Min. to 5" Max.above
Optional
FIGURE 55
Evaporator drain
line required
condensate drain connection)
FurnaceCondensate
Drain Connection