Completing The Installation; Closing The Blade Server Cover - IBM BladeCenter HS22 Type 7870 Installation And User Manual

Hide thumbs Also See for BladeCenter HS22 Type 7870:
Table of Contents

Advertisement

8. Remove the backup battery from DIMM connector seven.

Completing the installation

To complete the installation, complete the following tasks.
1. Reinstall the optional expansion unit, if you removed one to install other
2. Close the blade server cover, unless you installed an optional expansion unit
3. Reinstall the blade server into the BladeCenter unit (see "Installing the blade
4. Turn on the blade server (see "Turning on the blade server" on page 15).If you
5. For certain optional devices, you might have to run the blade server Setup

Closing the blade server cover

Use these instructions for information about how to close the blade server cover.
Attention: You cannot insert the blade server into the BladeCenter unit until the
cover is installed and closed or an expansion unit is installed. Do not attempt to
override this protection.
To close the blade server cover, complete the following steps:
devices (see "Installing an optional expansion unit" on page 22 for information
on installing the expansion unit).
that has its own cover (see "Closing the blade server cover").
Statement 21
CAUTION:
Hazardous energy is present when the blade server is connected to the power
source. Always replace the blade server cover before installing the blade
server.
server in a BladeCenter unit" on page 40).
have just connected the power cords of the BladeCenter unit to electrical
outlets, you must wait until the power-on LED on the blade server flashes
slowly before you press the power-control button.
utility to configure the blade server (see Chapter 4, "Configuring the blade
server," on page 45).
Chapter 3. Installing options
39

Advertisement

Table of Contents
loading

Table of Contents