Parts not supplied
for installation:
2, 1/4"x1-1/4" lag bolts with wall
anchors for concrete or concrete
block wall installations.
Note: Lag bolt length is based on
mounting bracket thickness only. Add
thickness of any wall coverings to
length of tag bolts/wall anchors used.
These can be obtained from local
hardware store.
Now start...
Tip Over Hazard
Do not use clothes vitalizer until
completely installed.
Install lag bolts securely into
wall studs.
Use two or more people to move
and install clothes vitalizer.
Failure to follow these
instructions can result in death
or serious injury.
la
With clothes
vitalizer in carton, lay
carton on back.
g0_
Open doors and
maximum
remove contents.
Important: Before the
clothes vitalizer is
installed on wall, do
not open doors more
than 90 ° to avoid
damaging the door hinges. Shut
doors and reapply tape or strap•
Leave clothes vitalizer in box.
a Remove the mounting bracket
assembly, nuts and lag bolts (if
installing in wall studs) from the
accessory box.
With washer sides of nuts facing
mounting bracket, start nuts onto the
bracket's threaded studs.
==Mark a horizontal line at least
24 inches long, 70-3/4" minimum
from the floor. Important: The line
MUST be level.
Product
Dimensions
5g"
I A
24 ....
i1.
130-;/4.
both
3'
doors
90 °
* 12" minimum clearance
to side wall
on left side of appliance
is required
for air venting.
** 24" minimum clearance to ceiling or
any non-removable
object (cabinet,
soffit, shelf, etc.) above vitalizer is
required for serviceability.
Model shown:
PVWN600
1" minimum
clearance
required at
bottom of
vitalizer for
ventilation.
35"
6 ft. power supply cord.
3-prong ground-type
out]at
must be located within 5
feet of lower right comer.
overall depth
(incl. handle)
models
weight
A
white doors
117 Ibs.
15-1/4"
biscuit doors
117 Ibs.
15-1/4"
wood panel doors
129 Ibs.
15-1/8"
mirrored doors
143 Ibs.
15-1/8"
studs
I I
I
I
I'
I
I
I
|._'+_ +r"_Ini++++
i i I
For wood stud installations, each lag
bolt MUST be installed in a wood stud
as shown. If there are not 2 studs in
moun_ng area, DO NOT install vitalizer.
DO NOT use toggle bolts through dry
wall to support the clothes vitalizer.
L_tine
Wood stud installation
be
level)
4a
• Locate and mark the
,
centers of each wall stud. Make
these marks about 72" from the floor,
I
114-20 nuts
with level line
4b.
Align the lower edge of the
mounting bracket assembly with the
level line. Select and mark a hole
location on each side of the bracket
that is closest to the center of each
stud.
C•
Set bracket aside and drill
5/32" pilot holes.
PAGE 3
Need help?
Do you have a question about the PVWN600 Series and is the answer not in the manual?