3. Refer to the drawing on page 6 and locate the long
access opening. Next, locate the two indicated gate
valves inside the opening. Make sure that the gate
valves are open and that the locking clips are
snapped onto the stems of the gate valves (refer to
the inset drawing in step 2 on page 8). Make sure
that the indicated collars are tightened.
Locate the drain hose inside the opening. Close the
valve knob on top of the drain hose and make sure
that the cap is fully tightened.
Refer to step 1 on page 8. Re-attach the Long
Access Panel (5).
4. The hydrotherapy spa operates on a 240-volt power source and must be wired directly to a 240-volt ground
fault circuit interrupter (GFCI) installed in your home. This procedure must be performed by a qualified
electrician. A wiring diagram is found on the inside of the electronics pack as a reference. Under no
circumstances should the spa be wired by someone other than a qualified electrician. Before you
have the spa wired, make sure that it is in the position you want and that it can be easily serviced, if needed.
5. After a qualified electrician has wired the spa to a
240-volt power source, refer to the inset drawing.
Set the Filter (16) into the filter housing. Next, screw
the Filter Cover (8) into the filter housing until it is
fully seated.
Remove the two warning decals (not shown) from
the spa shell. Using a damp cloth, wipe the spa shell
clean. Before filling the spa, make sure that it is
in the desired position and that there is room to
easily service the spa. Once the spa is filled, it
will have to be drained before it can be moved.
Using a garden hose or other clean water source,
begin filling spa. Do not use soft water. The spa
may be filled with cold water; however, if warm or
hot water is used, the spa will be ready for use
sooner. Fill the spa until the water is at the level
shown at the right. Do not overfill the spa.
6. Pull down one of the straps on the Spa Cover (11)
and hold the Buckle (30) against one of the cedar
panels on the spa. (Note: To position the Buckle cor-
rectly, have a second person hold the strap on the
opposite side of the Spa Cover tight.) The Spa
Cover must be tight. Do not place the Buckle
over the grooves between the cedar slats. Refer
to the inset drawing. Remove the latch from the
Buckle (30). Attach the Buckle to the cedar panel
with two #4 x 3/4" Screws (31).
Attach the other three Buckles (30) to the cedar pan-
els in the same way.
Remove the Spa Cover (11) from the spa.
3
Gate
Valve
Collars
Drain
Hose
5
Fill to the
molded Fill
Filter
Housing
6
11
9
Electronics Pack
Collars
Valve
Cap
Knob
16
Filter
line
Housing
Strap
Latch
30
31
Strap
30
Gate
Valve
8
Need help?
Do you have a question about the IMSB63101 and is the answer not in the manual?
Questions and answers