Determine Location - Weil-McLain Ultra Manual

Gas-fired water boilers – series 3
Table of Contents

Advertisement

-
gas
fired water boiler
Vertical vent/air termination:
Termination kit — Weil-McLain 3" PVC concentric
termination
1.
The Weil-McLain 3" PVC concentric termination kit must be pur-
chased separately. See Figure 101, page 93 for part number.
Use only the Weil-McLain 3" PVC concentric termina-
tion kit for concentric venting. Provide pipe adapters as
needed for 2" or 4" plastic piping or for AL29-4C vent
pipe.
2.
Purchase a bird screen separately. See the parts list at the end of
this manual.
Allowable vent/air pipe materials
1.
Use only the materials listed in
Maximum piping length
1.
Locate the termination such that the total air piping and vent piping
from the boiler to the termination will not exceed the maximum
length given in Figure 55.
2.
Maximum lengths listed in
elbows required a reduction in maximum length as explained in
the table notes.
Connecting from termination to boiler
1.
Install the termination as instructed in the following. Then pro-
ceed to page 48 to complete the piping between the termination
and the boiler.

Determine location

Locate the concentric vent/air termination using the following guide-
lines:
1.
The concentric vent/air assembly must terminate as shown in
Figure 56.
2.
The vent and air piping connected to the termination assembly
must comply with the instructions in this supplement.
3.
You must consider the surroundings when terminating the vent
and air:
a.
Position the termination where vent vapors will not damage
nearby shrubs, plants or air conditioning equipment or be
objectionable.
b.
The flue products will form a noticeable plume as they con-
dense in cold air. Avoid areas where the plume could obstruct
window views.
c.
Prevailing winds could cause freezing of condensate and water/
ice buildup where flue products impinge on building surfaces
or plants.
d.
Avoid possibility of accidental contact of flue products with
people or pets.
e.
Do not locate the termination where wind eddies could affect
performance or cause recirculation, such as inside building
corners, near adjacent buildings or surfaces, window wells,
stairwells, alcoves, courtyards or other recessed areas.
f.
Locate or guard vent outlet to prevent condensate damage to
exterior finishes.
42
— Boiler Manual
Figure 32, page 31.
Figure 55 allow for 1 elbow. Additional
3" PVC concentric
Figure 55
Maximum piping lengths for Weil-
McLain 3" PVC concentric termination
Boiler
Maximum
Ultra–
Piping, 2" *
Piping, 3" *
Feet
Elbows
Feet
80
30
1
100
105
30
1
100
155
Not allowed
100
230
Not allowed
30
310
Not allowed
Not allowed
* Install pipe reducers to adapt from pipe size used to the 3.5 inch
outside diameter required at the termination. You do not have to
reduce allowable pipe length for the reducers.
ers as necessary where connecting to the boiler vent and air
connections.
You do not have to reduce allowable pipe length for the 45° elbow
used to connect to the air fitting on the concentric assembly.
For piping using more than 1 elbow, reduce maximum allowable
length:
• 7 feet for each additional 4-inch elbow (90° or 45°)
• 7 feet for each additional 3-inch long radius elbow
• 16 feet for each 3-inch short radius elbow
• 7 feet for each 3-inch 45-degree elbow.
Figure 56
Vertical termination — Weil-McLain 3" PVC
concentric
Maximum
Maximum
Piping, 4" *
Elbows
Feet
Elbows
1
Not
1
allowed
1
1
70
1
70
1
Also install reduc-