D-Link ShareCenter DNS-315 User Manual page 180

1-bay network storage
Hide thumbs Also See for ShareCenter DNS-315:
Table of Contents

Advertisement

Step 6.
Click on the Finish button if you are satisfied with all the
Finished
settings of the Backup job created. Otherwise click on the
Previous button to go back and make changes. Alternatively
click on Exit to end the configuration without adding a
Remote Backup job.
Remote
Task: The name of the Remote Backup job.
Backups list
Schedule: When the Remote Backup job will execute.
Status: Current status which can be
Ready: The remote backup job is ready to be executed.
Finished: The remote backup job has executed completely
and successfully.
Failed: The Remote backup job was unsuccessful during
execution.
Enable/Disable: If the button shows a red circle the remote backup job is enabled. Clicking the red button will disable the
remote backup job ad the button will change to a green right pointing triangle. Clicking the green triangle will enable the job
again.
Backup now : Clicking this button will execute the backup job immediately as long as the job is enabled.
Recovery: Clicking this button will write the backup files and folders back into the source file system from the backup target
system (reverse the file direction).
Navigation buttons: Use these buttons to move up and down in the list when there are multiple jobs configured.
Refresh Button: Click this button during a backup or recovery process to monitor the progress by updating the progress
completed bar.
D-Link ShareCenter DNS-315 User Manual
175

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents