Gas Pressure Adjustment
C.
Figure 9C. Honeywell MV Gas Valve.
E
I
G
LECTRONIC
GNITION
Manual
Shut-Off
Valve
Figure 10. Location of Gas Pressure Adjustment.
P
S
G
C
IPE
IZING FOR
AS
Table 5. Maximum Equivalent Pipe Length.
Maximum Equivalent Pipe Length
Natural Gas 1000 BTU/FT3 0.60
Specific Gravity @ 0.5 in. WC Pressure Drop
Propane Gas 2500 BTU/FT3 1.53
Specific Gravity @ 0.5 in. WC Pressure Drop
Input
1/2"
Model (KBTU)
N
130A
130
15
W
C
ATER
ONNECTIONS
The heater requires water flow and positive pressure to
fire and operate properly. It must therefore be installed down-
stream of the discharge side of the filter pump. A typical
installation is plumbed as follows:
V
AS
ALVES
Manometer
Gas Pressure
Test at Gas Valve
ONNECTIONS
3/4"
1"
P
N
P
N
P
35
60 145 200 500
1. The inlet side of the filter is plumbed directly to the dis-
charge side of the filter pump;
2. The outlet side of the filter is then plumbed to the inlet of
the heater; and
3. The outlet of the heater is plumbed to the return line to
the pool or spa. The pump, filter and heater are thus
plumbed in series.
Plumbing from the heater back to the pool or spa must
not have any valves or restriction that could prevent flow
when the pump is operating.
Heater must be located so that any water leaks will not
damage the structure of adjacent area. PVC pipe may be
glued directly into optional or field-supplied header unions.
F
R
LOW
ATES
Table 6. Water Flow Rates.
MODEL
MIN. GPM MAX. GPM*
130A
*NOTE: When flow rates exceed maximum 100
GPM an external auxiliary bypass valve is required.
See External Auxiliary Bypass Valve section for
details.
P
H
OLYMER
EADERS
Before attaching the optional 2-inch unions to the In/Out
header, make sure the O-rings are properly seated in the
grooves. Use AquaLube or equivalent non-petroleum-based
lubricant on the O-ring. Hand tighten the unions. Glue PVC
piping directly to the unions.
Drain Plug
Figure 11. Optional In/Out Header for 2" Installation.
Figure 12. In/Out Header for 1-1/2" or 1-1/4" Hose Connection.
Installation
20
100
In/Out Header
O-Ring
Tail Piece
Nut
In/Out Header
Hose Connector
Hose
2" Pipe
Page 7