Westerbeke 5.0KW BCG-60Hz Operator's Manual page 7

Gasoline, single phase generators
Hide thumbs Also See for 5.0KW BCG-60Hz:
Table of Contents

Advertisement

INSTALLATION
When installing WES1ERBEKE engines and generators it is important that strict
attention be paid to the following information:
CODES AND REGULATIONS
Strict federal regulations, ABYC guidelines, and safety codes must he complied with
when installing engines and generators in a marine environment.
SIPHON-BREAK
For installations where the exhaust manifold/water injected exhaust elbow is close to
or will be below the vessel's waterline, provisions must
be
made to install a siphon-
break in the raw water supply hose to the exhaust elbow. This hose must he looped a
minimum of 20" above the vessel's waterline.
Failure to use a siphon-break when
the exhaust manifold injection pOri is at or below the load waterline will result in
raw water damage to the engine and possible flooding of the boat.
If you have any doubt about the position of the water-injected exhaust elbow relative
to the vessel's waterline under the vessel's various operating conditions,
install a
siphon-break.
NOTE:
A siphon-break requires periodic inspection and cleaning to ensure proper
operation. Failure to properly maintain a siphon-break can result in catastrophic
engine damage. Consult the siphon-break manufacturer for proper maintenance.
EXHAUST SYSTEM
The exhaust hose must he certified for marine use. The system must be designed to
prevent water from entering the exhaust under any sea conditions and at any angle
of the vessels hulL
Engines & Generators
iv

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents