Layout & Components; Pre-Installation; Cleaning Primary Systems - Worcester GREENSTAR 30CDi Installation, Commissioning And Servicing Instructions

Greenstar cdi classic regular wall hung rsf gas fired condensing regular boiler, for open vented and sealed central heating systems and indirect domestic hot water
Table of Contents

Advertisement

2.3
LAYOUT & COMPONENTS
21
20
19
18
17
16
15
14
13
12
11
10
Fig. 3 Boiler layout and components
32
31
30
29
3
4
5
2
1
6
28
max
27
The diagram above shows the controls in the servicing position and
excludes the outer case.
1. FLAME VIEWING WINDOW
2. IGNITION ELECTRODE AND FLAME SENSE ELECTRODE
3. HEAT EXCHANGER
4. OVERHEAT THERMOSTAT
5. ACCESS POINT FOR CLEANING HEAT EXCHANGER
6. DRAIN POINT
7. RETURN
8. GAS CONNECTION 22mm COMPRESSION
9. COVER FOR EXTERNAL WIRING CONNECTION
10. CONTROL PANEL IN SERVICE POSITION
11. FLOW
12. TRAP/SIPHON
6 720 806 548 (2013/02)
13. CONDENSATE HOSE
14. INLET PRESSURE TEST POINT
15. GAS VALVE
16. AIR / GAS ADJUSTMENT SCREW
17.TESTING POINT FOR FAN PRESSURE
1
18. FAN
19. PRIMARY SENSOR
2
20. AUTO AIR VENT
3
21. REMOVABLE TOP CASE PANEL FOR SERVICING
22. BLANK PLATE
23. DISPLAY
4
24. FAULT RESET BUTTON
25. NOT USED
26. NOT USED
5
27. MAINS ON/OFF INDICATOR/DIAGNOSTIC LIGHT (BLUE)
28. TEMPERATURE CONTROL
29. PERFORMANCE TEST BUTTON
30. SERVICE BUTTON
31. BURNER ON INDICATOR LIGHT(GREEN)
6
32. MASTER SWITCH ON/OFF
3
7
3.1
8
9
6720806548-01.1Wo
22
23
24
reset
eco
25
BEFORE CLEANING THE SYSTEM:
26
▶ Ensure that the system and pipe work is in good working order.
▶ Where possible keep the existing boiler/circulating pump in place
FOLLOW THE GUIDANCE OF BS7593:
6720648547-44.1Wo
Treatment of water in domestic hot water central heating and also the
flushing guidelines below.
FLUSHING THE SYSTEM
▶ Fill the system with cold water and check for leaks.
▶ Open all drain cocks and drain the system.
▶ Close drain cocks and add a suitable flushing agent compatible with
▶ Circulate the flushing agent before the boiler is fired up.

PRE-INSTALLATION

CLEANING PRIMARY SYSTEMS

NOTICE:
▶ All the following Pre-Installation sections must be read
and requirements met before starting boiler or flue
installations.
CAUTION:
▶ ISOLATE THE MAINS SUPPLIES BEFORE STARTING
ANY WORK AND OBSERVE ALL RELEVANT SAFETY
PRECAUTIONS.
NOTICE:
Debris from the system can damage the boiler and
reduce efficiency.Failure to comply with the guidelines
for the use of water treatment with the appliance will
invalidate the appliance warranty.
when flushing the system.
NOTICE: ARTIFICALLY SOFTENED WATER MUST NOT
BE USED TO FILL THE CENTRAL HEATING SYSTEM.
aluminium at the correct strength for the system conditions in
accordance with the manufacturer's instructions.
The pH value of the system water must be less than 8 or the
appliance guarantee will be invalidated.
PRE-INSTALLATION