COMMISSIONING
INSTALLING BOTTOM PANEL:
2. The bottom panel slides onto two ledges (C) either side of the boiler
frame.
▶ Hold the panel up against the underside of the boiler and slide
towards the rear until it is fully engaged.
HANDOVER:
▶ Complete the Benchmark check list.
▶ Open the fascia cover by pulling the centre top of the cover (D).
▶ Set up the controls and show the user how to operate all the controls
shown in the User Guide.
▶ Place the user guide into the tray (E) on the inside of the facia cover.
▶ If the appliance is unused and exposed to freezing conditions; shut off
all the mains supplies and drain the system and boiler.
A
Fig. 46 Fitting outer case
30
B
B
6720647361-25.3Wo
D
Fig. 47 Fitting bottom panel
C
6720647361-26.3Wo