PRO
Side Mount Packaged Refrigeration System
3

Inspection

1.
Each shipment should be carefully checked against the bill
of lading.
.
The shipping receipt should not be signed until all items listed
on the bill of lading have been accounted for.
3.
Check packaging for signs of damage.
4.
Any shortage or damages should be immediately reported to
the delivering carrier.
5.
Damaged material becomes the delivering carrier's
responsibility, and should not be returned to the manufacturer
unless prior approval is given to do so.
6.
All units are shipped on heavy skids and enclosed in open
crating. Generally, it is advisable to bring the unit as close to
its final location as possible before removing crating.
7.
When unpacking the system, care should be taken to
prevent damage.
8.
Avoid removing the shipping base until the unit has been
moved to the final destination.

Installation Requirements

Recommended Unit Placement

1.
Ensure that the structural integrity of the box can withstand
the weight of the side-mounted equipment.
.
The air pattern must cover the entire room
3.
Location of aisles, racks, etc. must be known
4.
For space requirements, see FIGURES 1 and 2
FIGURE 1: System Space Requirements | Back View
Leave this area unobstructed
PRO
Side Mount Packaged Refrigeration System Installation and Operations Manual, May 008
3
FIGURE 2: System Space Requirements | Side View

Access Requirements

Condensing Unit Section (Exterior of box)

Provide adequate access space (minimum 36") on the right side of
the unit for electric box clearance. The front of the unit should have
a minimum of 4" clearance for compressor and fan motor service.
The left side of the unit should be a minimum of 8" clearance.
FIGURE 3: Access Requirements | Top View
18"
8"
24"

TOP VIEW

Evaporator Section (Interior of box)

The front of the evaporator should have no obstructions since this
is the leaving airside of the evaporator. There should also be no
obstructions under the evaporator. A minimum of 8" clearance should
be held on each side of the evaporator for drain pan removal.
24"
Leave these areas
unobstructed
18"
4.00
36"
3