Water Tube
3 Connect the fridge freezer to the power supply and switch
it on.
Caution - You must wait at least 8 hours
after installing the fridge freezer before
switching on to allow for oil in the
compressor to settle.
water button
4 Press and hold the
for two to three minutes until the water tank is full and
waters starts to fl ow from the dispenser.
22
Rubber Washer
on the control panel
Fridge freezer user guide