Building In - Zanussi ZGF 789 Instruction Booklet

Table of Contents

Advertisement

Building in

Building over a cupboard or
drawer
If the hob is to be installed above a cupboard or
drawer it will be necessary to fit a heat resistant
board below the base of the hob on the underside
of the work surface.
Building over a kitchen unit with
door
Proper arrangements must be taken in designing the
furniture unit, in order to avoid any contact with the
bottom of the hob which can be heated when it is
operated. The recommended solution is shown in
diagram 1.
The panel fitted under the hob ("a") should be easily
removable to allow easy access if technical
assistance is needed. The space behind the
kitchen unit ("b") can be used for connections.
FO 1013
a) Removable panel
b) Room for connections
8
1
FO 0947
FO 0939
Building over a kitchen unit with
oven
If the hob is built into a kitchen unit with an oven
underneath, the recess must have the dimensions
shown in diagrams 2 and 3, and should also incor-
porate suitable oven crosspiece supports to ansure
an efficient cooling air circulation.
Diagrams 4 and 5 give two building-in examples.
The electric connection of the hob and the
oven should be carried out separately, for
electrical safety reasons to permit easy
extraction of the oven from the front part of
the kitchen unit.
2
FO 0198
4
FO 0938
3
5

Advertisement

Table of Contents
loading

Table of Contents