1. Bolt (× 2) (Under fenders)
1. Quick fastener (× 2)
2. Panel C
To install
1. Place the panel in the original position
and install the quick fasteners.
2. Install the front carrier by installing the
bolts and tightening them to the specified
torques.
Tightening torques:
Carrier bolt (top):
26 Nm (2.6 m·kgf, 19 ft·lbf)
Carrier bolt (under fenders):
7 Nm (0.7 m·kgf, 5.1 ft·lbf)
3. Install the stay covers.
8-10