1. Bolt (Left side/Right side)
1. Quick fastener (× 2)
2. Panel C
To install
1. Place the panel in the original position
and install the quick fasteners.
2. Install the front carrier by installing its
bolts and tightening them to the specified
torques, and then by installing the stay
covers.
Tightening torques:
Carrier bolt:
19 Nm (1.9 m·kgf, 13 ft·lb)
8-10