To Install And Remove Collets - Central Machinery ROUTER WITH FULL SIZE TABLE 91130 Assembly And Operating Instructions Manual

Router with full size table
Table of Contents

Advertisement

rear of the Upper Fence (16C), using the remaining two pre-fitted Nuts (11C) in
the channel of the Upper Fence and two Screws (9C).
(See Assembly Diagram C and Figure M.)
DUST PORT ASSY.
(26C)
FENCE LOCK KNOB
(8C)
FIGURE M

To Install And Remove Collets:

1.
WARNING! Always make sure the Power Switch (9B) is in its "OFF"
position and the Power Cord/Plug (1B) is unplugged from its electrical
outlet before making any adjustments to the Router Table.
2.
The Router is equipped with a 1/4" Collet (18D) and a 1/2" Collet (24D).
3.
The Collet (18D, 24D) may need to be changed to allow use of larger or smaller
diameter router bits (not included).
4.
NOTE: When changing Collets (18D, 24D) or when changing router bits, the
height of the Motor Assembly should be raised to the maximum height to gain full
access to the Collet Nut (19D).
5.
Unlock the Height Adjustment Lock (23D) by rotating it in a counterclockwise
direction, using the end of the Wrench (21D) provided.
(See Figure N, next page.)
6.
Remove the Collet Assembly Cover (15D) by removing the two inner Screws
(1D) on the Cover and lifting the Cover away from the Height Adjusting Ring
(14D). If necessary, clean off any saw dust and debris which may have built up
from previous cutting operations. (See Figure N.)
SKU 91130
For technical questions, please call 1-800-444-3353.
PROTECTOR
(23C)
UPPER FENCE (16C)
Page 18

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Central Machinery ROUTER WITH FULL SIZE TABLE 91130

This manual is also suitable for:

91130

Table of Contents