Log Splitter Assembly - Greyhound 56072 Set Up And Operating Instructions Manual

20 ton log splitter
Table of Contents

Advertisement

be cleaned even if they are new or
appear clean. Allow all pieces to dry
completely.
3.
Place fresh, clean bearing grease in
the packer (not included).
4.
With the grease-filled bearing packer
in one hand and the Bearing (52) in
the other, press the Bear ing into the
grease, forcing the grease inside the
slots in the bearing, continue doing
this until every slot in the Bearing is
completely full of grease.
5.
Do not get any dirt or debris on any
part of the assembly. Secure with
Bearing Seal (51)
6.
With each Tire in place, add a Wash-
er (55) and a Castle Nut (54) onto
the ends of the Axles. Tighten the
Castle Nuts to 20-25 ft. pounds, and
rotate each tire several turns to seat
SKU 56072
For technical questions, please call 1-800-444-3353.
the bearing. Back off the Castle Nut
one half turn. Insert a Cotter Pin (53)
through both the Axle and the Castle
Nut and bend the end of the Pin back
to hold it in place.

log splitter assembly

please note: This item is extremely
difficult to assemble without heavy
equipment to lift and secure parts
in place on the item. The base and
main beam junction of the product
require the alignment of holes
with the four bolts and nuts used
to secure the two pieces together
during operation of the item. Do not
assemble without assistance. If you
do not feel entirely confident about
your ability to assemble the Log
Splitter correctly, contact a qualified
service professional to assemble the
Log Splitter.
Page 8

Advertisement

Table of Contents
loading

Table of Contents

Save PDF