Greyhound 56072 Set Up And Operating Instructions Manual page 9

20 ton log splitter
Table of Contents

Advertisement

1.
Raise the Engine and Oil Tank
Assembly about 9 inches onto
a secure platform. Connect the
Wheels to the axles using the
supplied hardware (parts 53 - 55)
as previously stated. (It may be
necessary to reset the wheel
bearings after the Log Splitter has
been towed.)
2.
With the Engine and Oil Tank
Assembly still raised, attach the Rail
Assembly (19) using Hex Bolts (24)
and Hex Nuts (32). Pay attention to
the directional Arrows on the unit.
They will aid in assembling the unit in
the proper orientation.
Figure a
3.
Use Hex Bolt (43) to install the sup-
port assembly - See Figure A.
4.
The Push Pin (42) is used for both
standing and towing positions.
5.
Install the Hitch Coupler (39) onto the
Rail Assembly (19), using the Hex
Bolts (09, 35), a Washer (36), and
Hex Nuts (38, 30).
SKU 56072
For technical questions, please call 1-800-444-3353.
Figure B
6.
Install Bezel (45), with 6 sets of Hex
Nuts (30) and Hex Bolts (37) - See
Figure B.
Figure c
7.
The control valve stand is attached
onto the oil reservoir with 4 Hex Bolts
(70) - See Figure C.
Page 9

Advertisement

Table of Contents
loading

Table of Contents