Install The Pop-Up Drain - Grohe Axor Citterio M 34010XX1 Installation Instructions Manual

Hansgrohe lav/bidet mixer installation instructions / warranty
Table of Contents

Advertisement

Install the pop-up drain*

Remove the plunger assembly.
Unscrew the drain outlet flange from the tee.
Unscrew the tailpiece from the tee. Wrap
the threads with two layers of Teflon tape and
replace.
Install the white, flexible sealing gasket to the
flange. Place it in the sink outlet.
From under the sink, install the black mack gas-
ket, white friction ring and retainer nut to the
flange. Do not tighten the nut against the bottom
of the sink at this time.
Thread the tee and tailpiece to the flange. The
pivot must face the faucet. If necessary, turn the
drain assembly.
Tighten the retainer nut.
Place the plunger assembly in the drain.
Install the horizontal rod so that the end goes
through the loop in the bottom of the height
adjuster.
Install and hand tighten the pivot ball nut.
Attach the swivel connector to the end of the
horizontal rod.
Attach the swivel connector to the end of the
pull rod. Position as desired and tighten with a
small, flathead screwdriver.
*Drain and pull rod not included with models 34017XX1
or 34027XX1.
pull rod
pivot ball nut
horizontal rod
swivel connector
plunger
height adjuster
flange
sealing gasket
mack gasket
friction ring
retainer nut
tee
tailpiece
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents