Zenith Z42P3 Installation And Operating Manual page 15

Zenith
Hide thumbs Also See for Z42P3:
Table of Contents

Advertisement

How to arrange the cable (For 50 inches)
Hold the CABLE MANAGEMENT with both
1
hands and push it as shown.
3
Reinstall the CABLE MANAGEMENT as
shown.
Connect the cables as necessary.
2
To connect an additional equipment, see the
External equipment Connections section.
For 42 inches
Arrange the cable as shown.
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z50p3

Table of Contents