Remote Blower - Thermador CVS2 Installation Manual

Downdraft
Hide thumbs Also See for CVS2:
Table of Contents

Advertisement

Step 7: Mount Integral Blower or
Outlet Duct Transition for
Remote Blower
Integral
Blower VTN600CV2C
(See
Figures 10 and 12 for further detail):
A.
Attach blower in front of round exhaust
outlet with 4-6 (depending on configura-
tion) #8 sheetmetal screws
B.
Feed cord from blower through strain
relief.
C. Secure strain relief with screws.
D. Attach strain relief to downdraft near
junction box.
E.
Connect cord to downdraft at 6 pin con-
nector
F.
Connect blower to ductwork.
Remote Blower VTR600R or VTR1000Q
(See Figures 11and 12 for further detail):
A.
Remove junction boxcoverand
connect
conduit with 5 wires from remote blower.
Hook up wires per Wiring Diagram,
Fig. 10. Replace junction box cover.
B.
Attach duct transition Model CV2T6 at
mounting holes with sheetmetal screws.
C. Feed remote blower pigtail through strain
relief.
D. Attach strain relief to downdraft near
junction box.
E.
Connect pigtail to downdraft at 6 pin
connector.
F.
Run pigtail wires to junction box.
G. Inside junction box, connect conduit with
five wires from remote blower. Use a
conduit connector to secure.
Note:
Blower and duct transition box may be
installed with duct outlet left, down or
right. Install blower or duct transition in
such a way that access panels can be
removed for service.
Figure
10 - Internal
Blower
Internal Blower
Figure
11 - Remote
Blower
Transition
CV2T6
6 Pin
Connector
/
/
Strain Relief
6 Pin Connector
Junction
Box
Strain Relief
Remote
Blower
Pigtail
Conduit
To
Remote
Blower
Page 11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ucv2

Table of Contents