Step 3: Prepare Duct Cutouts In Cabinet - Thermador CVS2 Installation Manual

Downdraft
Hide thumbs Also See for CVS2:
Table of Contents

Advertisement

/
Countertop
Surface
J
Left Side
_,/-
Point "P"
(Center of Rear Cut-line)
./
Right Side
Cabinet Back
F
Plumb line to
intersection
A-A
& B-B
A
C!
B
A
.rl nes .,f
_._
"N
I
ular Duct Shown
_
W E
Cabinet Bottom Shelf
NJ
4
Receptacle
Location
Figure 9: Cabinet Cutout for Ductwork
Cabinet Cutout Dimensions
for Blower:
6 3/8"
14 1/2"
1 7/8"
15 1/2"
9 3/4"
Table 4: Cabinet Cutout Dimensions
STEP 3: Prepare Duct Cutouts in Cabinet
A.
Refer to Figure 9. Drop a plumb-line from Point "P" at
the rear center of the countertop cutout. Mark this point
on the bottom of the cabinet below, Construct two
reference lines through this point: one should be parallel
to the cabinet front and directly below the rear counter-
top cutout (Line A-A), and the other (Line B-B) should
be at right angles to A-A.
C,
wall studs, floor joists, utilities, or other obstructions,
Temporarily set intake and cooktop in place and attach
integral blower (or duct transition fitting if a remote
blower is installed), Refer to steps 6 and 7, Verify that
the duct cutouts as marked will match the hardware
installation. Adjust the duct cutout as necessary to
match hardware installation.
B,
Using these reference lines as a base for the measure-
ments shown in Table 4, layout the necessary cabinet
cutouts needed to implement
the planned ductwork
route, Where a range of measurements
is noted,
choose a measurement that allows best clearance from
D. Remove temporarily placed hardware and make cutouts
in cabinet to accommodate
ductwork installation.
E.
Make all other cabinet modifications needed to provide
proper clearances for drawers or removable shelving,
Page 9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ucv2

Table of Contents